Please clarify,
1. Is it required to lay two runs of GI wire along
with Armoured LT cable if it is laid between one big mains
(63Amps TPN SDF) to small main (32A TPN SDF) with proper
glanding termination?
2. If the armoured cable with proper glanding is laid from
DB to CNC machine, is it required to run two runs of body
earthing to the Machine from DB?
3.If the armoured cable with proper glanding is laid
from Substation to Hangar, distance is approx. 100 mtrs, is
it required to do earthing at shop area though the primary
termination at substation is earthed through gland.
No Answer is Posted For this Question
Be the First to Post Answer
In hydel power plants, L.A's, S.C's are placed inside the control panel boards. what is the purpose? [already the total body was earthed to ground.]
advantage and disadvantage of team work?
what is first pole to clear factor ?
Define over current & earth fault ?how its functioning ?
what is the difference between electrical & electronics
245 Answers Axon Constructions, Banking, GDA Technologies, Infosys, MBA, Satyam, Satyam Tech, Snow White, TCS,
what is torque & how it will produce & what is the formula for that.
What's ND relay & it's functions?
What are unstable systems?
how many winding in the single phase transformer?
why the weight of oil in transformer is specified (on the nameplate) in litres as well as kilo grams?
why we use star and delta connection?why we donot give the supply directly?
12 Answers Hitech, Siemens, Tata Steel Limited,
what is principle operation of transformer?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)