a g+2 building having mezenine floor ,but stair is
approching only 1st and 2nd floor, in this case stair is
calculate in plinth area for mezenin floor or not?
how much cement and sand required for 1cum rr masonry
how to calculate cutting length in bar bending schedule for 180 degree bend? for 90 degree bend we take 2d i.e we -2d for 180 degree ho much ? question asked at l&t
What does civil status mean?
i have a bar diagram as straigtht bending, but i maked circle bend, how to i justify to others?
How much kilogram of binding wire required for fabricate one Metric ton of reinforcing steel
What Is the Thumb rule to calculate depth and dia of pile required to carry specified load on differeent soil
How can we convert weight batch to volume batch for m30 mix
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
How may digree of freedon in four bar chain.
what is pouring and explain
what is right time of slab DE shattering and beam boo tam.
difference between deep and shallow well?