Answer Posted / g himanth kumar
For the concrete with different grades the strength development for 7days is approximately 60 to 70% of its 28days characteristic strength.
| Is This Answer Correct ? | 14 Yes | 4 No |
Post New Answer View All Answers
A super elevation of 60 cm has been provided on a 8m wide road and a curve of 260m radius .calculate the max.speed in km/hr of the vehicle that can be negotiated safely? Plz answer with full solution.thanx
Forces in a Shear Wall are in plane or out of plane ?
How many mortar required for Brickwork of 1 Cu.m works??
how to prepare site mix design
The concrete slump recommended for beams and slabs; is?
Which are the top apps for you civil engineering?
In the roof of a pumping station explain briefly the components of a waterproofing system?
If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in
what is the difference between replacement of cement by groundnut shell ash
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
How many times we can use Fresh bentonite ford wall execution? Would like to know the clear concept of recycling. After flushing can we use it for another time time for flushing? Or we have to use it for for excavation only?
brickwork labour rate per cum ?
types of laps in column
whou haat goals do you have in your career
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick