28. A and B can finish a piece of work in 20 days .B and C
in 30 days and C and A in 40 days.
In how many days will A alone finish the job
(a) 48
(b) 34 2/7
(c) 44
(d) 45
Answers were Sorted based on User's Feedback
Answer / sagar rath
A+B ONE DAY WORK=1/20
B+C ONE DAY WORK=1/30
(A+B)-(B+C)=1/60=A-C
A-C=1/60-------------(1)
A+C=1/40-------------(2)
ON SOLVING BOTH WE GET A=48 DAYS.
| Is This Answer Correct ? | 32 Yes | 4 No |
Sita bought a handbag for Rs. 144 and got a percentage of profit equal to the cost price of the handbag. What is the cost price of the handbag?
Choose the odd man out from the below mentioned options?
A family I know has several children. Each boy in this family has as many sisters as brothers but each girl has twice as many brothers as sisters. How many brothers and sisters are there?
i need last 5yr sbi question paper. i have exam on 6th july.plz send me
1027.05 ? 314.005 + 112.25 = ? (a) 825.395 (b) 825.095 (c) 825.305 (d) 825.295 (e) None of these
A person goes 4/5 of his usual speed reaches 10min late to his destination, time taken?
What is the optimum number of operations for 2*(x**3)+3*(x**2)+5*x+5?
A telephone cable is to be run from a junction point on the bank of a river 900 meters wide to an office that is located 3000 meters downstream on the opposite bank. If the cost of laying cable under water is Rs. 5 per meter and that of laying overhead on land is Rs. 4 per meter, find the point downstream where the cable is to cut across the river. (a) 450 (b) 1800 (c) 2800 (d) 2100 (e) 2700
what area is covered under clerical aptitude in bank clerical exams????????????
x==2+2^(2/3)+2^(1/3) .Then what is the value of x^3-6X^2+x ? here X^Y indicates X to the power of Y.
Rearrange BBIRAT
how to calculate three digit number multiplication? send me any shortcut? 235*235