28. A and B can finish a piece of work in 20 days .B and C
in 30 days and C and A in 40 days.
In how many days will A alone finish the job
(a) 48
(b) 34 2/7
(c) 44
(d) 45
Answer Posted / sagar rath
A+B ONE DAY WORK=1/20
B+C ONE DAY WORK=1/30
(A+B)-(B+C)=1/60=A-C
A-C=1/60-------------(1)
A+C=1/40-------------(2)
ON SOLVING BOTH WE GET A=48 DAYS.
Is This Answer Correct ? | 32 Yes | 4 No |
Post New Answer View All Answers
f(X)= 2X-1 + f(X-1) if X is not equal to zeroandiff(X=0)=0, If f(f(X))=81 then the value of X=?
If A=Z, B=Y, C=X, .......... Z=A, Then SOUR = ?
If the total distance of a journey is 120 km .If one goes by 60 kmph and comes back at 40kmph what is the average speed during the journey?
The lowest temperature in the night in a city A is 1/3 more than 1/2 the highest during the day. Sum of the lowest temperature and the highest temperature is 100 degrees. Then what is the low temp?
In the word ORGANISATIONAL, if the first and second, third and forth, fifth and sixth words are interchanged up to the last letter, what would be the tenth letter from right?
Three independent mechanisms A, B and C have been incorporated for power saving in a plant producing respectively 30%, 40% and 10% efficiency. Assuming that they operate independently, what is the net power efficiency achieved
G(0)=-1, G(1)=1, G(N)=G(N-1) - G(N-2), G(5)= ?
in pure milk if 20% replaced by water and in this again 20% is replaced by water and again 20% is replaced by water then what is the proportion of milk in that mixture
Every station in N rail road issue every other station's ticket. some stations are added.Now they have to issue 46 more tickets. say the No.of stations after and before added.
what ia tha c++ code to find the position of prime numbers in prime number series??
There are 6 consecutive numbers P, Q, R, S, T, U, not necessarily in that order. Given that, Q is 2 less that P, P is 3 less that T and R is 2 less than S, arrange them in an ascending order.
What is the smallest number by which 2880 must be divided in order to make it into a perfect square ?
25 stations ,24 stations are inbetween- - - - - how many tickets should be required.
If f(0)=1 and f(n)= f(n-1)*n, find the value of f(4).
A finish the work in 10 days. B is 60% efficient than A. So hoW days does B take to finish the work?