Answer / narendra sharma

Because digital output module out put lode capacity is low
and use relay then we can incrise the output lode & lode
short ckt proctaction also....
in input module pts not need more current and voltage just
a on-off pules

Is This Answer Correct ?    4 Yes 1 No

What is purpose to use relay after digital output module? Why normally we don't use relay for ..

Answer / madam.bhupal

Because digital output module out put lode capacity is low
and use relay then we can incrise the output lode & lode
short ckt proctaction also....
in input module pts not need more current and voltage just
a on-off pules.
some time need digital input card also as per req.

Is This Answer Correct ?    2 Yes 0 No

What is purpose to use relay after digital output module? Why normally we don't use relay for ..

Answer / senthil

Digital O/P module used as interface relay(isolation
circuit) between controller to the load. we cannot connect
the controller output to the load side, which may required
high amps to energise a contactor coil or etc.,In this way
controller is not get loaded.

Is This Answer Correct ?    3 Yes 2 No

Post New Answer

More Industrial Engineering Interview Questions

about generator

5 Answers   Bhel,


What kind of tools and materials are required to test water softening system of heating plant?

0 Answers  


I want to know about a good liquid scrubber that we can use in acid washing.

0 Answers  


What is APIPA in DHCP?

1 Answers   TCS,


Why the thermocouple is a transducer an rtd is not a transducer both taking heat as a input and give millivilt and ohms.

0 Answers  






why data registers are needed in PLC ?

0 Answers   Samtel,


What environmental controls?

0 Answers  


why power contactor using in DG set's neutral which is using as a stand by load during government electricity shutdown?

0 Answers   FAG,


how to find the electricity cost per m3 in ready mix concert plant?

1 Answers   UltraTech,


how can LED bulb indication work correctly without CT OR PT for 3 phase indication if one is cut then it will show the correct indication?

0 Answers   UltraTech,


What is purpose to use relay after digital output module?

0 Answers  


how could you change gas line control valve to liquid line valve?

0 Answers   TATA,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)