Answer / mfsi_sitamj
Hi Vkumar9218,
Risk analysis technique is a procedure to analyse the likelihood
and impact of the risk and take preventive steps in early stages
to reduce the chance of the risk to be introduced
later stages.
For any product or project risk we have 4 typical options which
we can follow :-
1) Mitigate: Take steps in advance to reduce the likelihood
(and possibly the impact) of the risk.
2) Contingency: Have a plan in place to reduce the impact
should the risk become an outcome.
3) Transfer: Convince some other member of the team or
project stakeholder to reduce the likelihood or
accept the impact of the risk.
4) Ignore: Do nothing about the risk, which is usually a
smart option only when there's little that can be done
or when the likelihood and impact are low.
Thanks and regards
Sitam
Is This Answer Correct ? | 0 Yes | 0 No |
What is test idea? What is tets plan?
What is QMS,PMS,BMS
How do you train another QA engineer?
what is output of testplan?
What is the diff b/w Quality Assurence and Quality Control ?..
11 Answers FIC, Visualize Technology,
What kinds of performance tests might be required for a word processing system?
What is the Differnce B/W Quality Management and Quality Control
can anybody explain me the role of QA in every phase of SDLC (PHASE WISE) to privent from bug.with real life example.1)requirement analy.2)designing 3)coding 4)testing 5)implementation 6)maintenance. PHASE WISE
How can you introduce new software qa processes to an existing organization?
I would like to know whether Zephyr, the test management tool takes a complex installation procedure?
u know the control flow & data flow then what type of testing u want to choose?
What is exploratory testing and specification-driven testing?