Hi buddies! i am facing a problem and if someone could help
me it will be an immense pleasure to me. we have compect
logix PLC 1769 2L AO module to Heat @ 52 to 56 Deg C .So if
anyone can do please help me out with this problem.I'll be
highly grateful.
What is feedback system.
if RTD damage in plant, how we know?
what is the usage of QDV & VOLUME BOOSTER
While preparing the graphic diagrams trend display, 3 types of trends are prepared by Yokogawa system vender. These are for process variable, manipulated variable & set point variable. Why these 3 trends are required? Explain the purpose of these 3 trends.
what is the process for double acting cylinder pneumatic for 32' v/v
How many ohms are required for proper earthing?
Name four general (not technical) criteria that would you consider important, when deciding upon a particular control valve?
Please can anybody help for control valve sizing step by step procedure?
Emergency Shutdown Systems/ Plant Shutdown System.
I am a electronics and instrumentation fresher trying for a job in IT sector. what do need to prepare for the interview?
how the presure switches are calibrated? and what happen inside?
How we can check the 2 wire proxy switch? & how it is connected to DI MODULE OF PLC?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)