Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


hai can anyone send me soft copy of o.p gupta or tell me downloading link please please at saify_0@hotmail.com


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Chemical Engineering Interview Questions

What is a good relation to use for calculating tube bundle diameters?

0 Answers  


ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.20 : Assume an engineer buys a $1 bond in period T while the nominal interest rate is R. The inflation rate at T + 1 is anticipated to be I. (a) If the bond is redeemed in period T + 1, how much money will the buyer engineer receive, in term of R, which is not affected by inflation? (b) Find the present value, PV of the proceeds from the bond, in term of R and I. (c) If the bond is redeemed in period T + 1, calculate the real growth or real value of the money that the buyer engineer will receive, in term of r = real interest rate, which is affected by inflation. (d) From the answers in (b) and (c), find the values of x, y and z in the following Fisher equation : (1 + x) = (1 + y) / (1 + z), in term of r, R and I.

1 Answers  


we have 2 O2/Comb Analyzers Servomex Model 2700 in service for one of the furnaces in our chemical plant. It is giving High Temperature Alarm. Checked Temperature and found it to be 800 Deg C whereas Set Point is 700 Deg c. It is strange why is temperature not at SP. Also response is 23 % with 21 % Inst Air and with N2 reading is not coming down. please clarrify this issuses very urgent

1 Answers  


I HAVE DOMAIN KNOWLEDGE IN PROCESS MANUFACTURINGAND I GOT AN APPARTUNITY AS A BUSINESS ANALYST AND I DNT HAVE ANY KNOWLEDGE ON ORACLE APPS/GIVE ME ANY VALUBLE SUGGESTION?

0 Answers   Satyam,


Explain what types of metals are typically removed via chemical precipitation?

0 Answers  


What is some common piping materials used to transport slurries?

0 Answers  


What is a Spool in terms of piping Industry?

2 Answers   Punj Lloyd Ltd,


How can wet carbon dioxide be responsible for a corrosion problem in iron-containing metals?

0 Answers  


Explain what are the methods involved to test helium leak testing in a vacuum system?

0 Answers  


Define octane number?

0 Answers  


ENVIRONMENTAL ENGINEERING - QUESTION 22.1 : In order to predict the wastewater production, the population number has to be understood. The population data is : 72000 (for year 1961 or P-1961), 85000 (for year 1971 or P-1971), 110500 (for year 1981 or P-1981). (a) Find the average population increase, or [ (P-1981 - P-1971) + (P-1971 - P-1961) ] / 2. (b) Find the average percentage population increase, or [ (P-1981 - P-1971) / P-1971 + (P-1971 - P-1961) / P-1961 ] / (2) X 100. (c) Find the incremental increase or P-1981 - 2 (P-1971) + P-1961. (d) Let Po = P-1981. After 2 decades or n = 2, the population is P-2001. By using arithmetical increase method, find P-2001 = Po + n (Answer for a). (e) By using incremental increase method, find P-2001 = (Answer of d) + n (n + 1) (Answer of c) / 2. (f) By using geometrical increase method, find P-2001 = Po [ 1 + (Answer of b) / 100 ] ^ n where ^ is power sign, or 1 ^ 2 = 1 x 1 = 1. (g) If the actual P-2001 = 184000, which method of estimation is more accurate, based on your answer in (d), (e) and (f)?

1 Answers  


What is fuel requirement of 20kg/hr of incineration having material calorific value 6500 kcal/kg and diesel calorific value 10707 Kcal/Kg (PCC=850 degC and SCC 1050 Deg c)

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)