what is entry / exit criteria and pass / fail criteria ?
Entry and Exit criteria
1. Entry Criteria: The conditions to start testing.
2. Exit Criteria: The conditions to stop testing.
Pass/Fail criteria (conditions)
Specify the conditions if statements to accept the build for
testing (or) Reject the build
| Is This Answer Correct ? | 8 Yes | 1 No |
Who will Prepare the Tracebility Matrix?
4 Answers Cap Gemini, Ramco, Wipro,
Hi, I got an offer with maveric systems and I have around 3.5 years of work experience. But inspite of that they are asking to sign a bond for 2 years and to pledge all the original certificates for that bond. Can anybody please advice me whether its a good company or not and can i go ahead with this?
how to write integrated test case for an ATM?
WHAT IS LOAD TESTING
2.How should we post the bugs, Difference between priority and severity, Difference between sanity and smoke testing and Problem faced during development - please mail the answers to my mail id thanu_santo@rediffmail.com
When to start Software Testing?
What is the Stub abd the driver ?Are these both using at the time of Top-up approach of integration testing and bottom-down approach testing .?
Multiple class testing is too complex to be tested using random test cases. is it
What is ERP.Give a simple description about that.
What is primary duty of tester ?
17 Answers nvidia, Symantec, Veritas,
We r developing one Web Site for construction company. In that Web site we have different option like About Us,Contact Us,Home,Sites,Site Map,Search Etc........ and front page of that web application contains 6 different pictures means single page contain 6 pics etc... write Test plan ,Test Scenarios,Test Case ....Plz answer this question ASAP
Inwhat basis the time is allocated for testing the application?