There is one 40MVA oil cooled transformer (yet to
commission), filled with 95% oil and we are trying to fill
5% Nytrogen in that transformer so that there should not be
any foreign component inside. But even though there is no
leakage, nytrogen is not withstanding inside transformer,
within a day or two pressure guage is showing 0. Why is it
soooo? Pls reply.
how mach PF mainten in DG
How can we find out earth leakage,(shock)in side the house?.. (with out ELCB)
how we explain parallel paths armature winding?
Is it acceptable of installing an earth pit in planters area where bare copper cable, earth rod and connection are susceptible to corrosion due to water?
what do you mean by the "bay" in a switchyard? how to determine exact number of bays in a substation?
How the starter control the starting current in three phase AC Motor?(In DC apply the reistance).
TO CALCULATE THE RESISTANCE OF GRR OF HT MOTOR 400KW WHEREAS STATOR VOLTAGE 6.6KV AND ROTOR VOLTAGE 705V AND ROTOR CURRENT IS 346A.
what is the effect when the shunt field winding is opened in dc shunt motor (i) at the time of starting ? (ii) in running condition ?
What is phase cross over frequency?
How to select earthing strip for 100kw induction motor ?
which INDIAN STANDERD in Mention the earth test value?
redundant connection in contactor?