Answer Posted / manikanta73
due to over compaction of concrete aggregates goes down and cement and water comes up and forms a layer called laitance
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
explain the advantages of total stasion
Pls explain me about tension and compression in a flat slab
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
A Cat excavator loader of 3Lm*3 heaped capacity bucket is to be used to load blasted rock directly into a crusher of capacity (consumption) of 100L
How can i do RCC rate analysis?
What is the Systematic Responsibility Site Engineer? Who are the above and under co-oridinating ? What is office & Site co-ordination of Site Engineer?
What are the alternate material for steel, Sand and aggregate
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
What is the ideal size of the living room ranges from small to large size?
What in your past experience or education prepares you for the position for which you are applying
what is m30 in concrete tiles
why do we provide haunches in rcc box or underpasses?
What are the skills required to become an architect?
What is the difference between routing maintenance and major maintenance in school facilities?