how do i commission a distribution transformer knowing all
its ratings and transformation ratios?d
Answer Posted / aamod tripathi.
Commissioning a distribution transformer knowing all its
rating, Transformation ratio, Vector group, Phase sequence
is a skilled Job. You will need the information of complete
system like where the distribution transformer you are
talking about comes.
Information needed will be,
1. Single Line Diagram of the complete circuit (So as to
clearly understand the vector group/ rating of the
transformer to be installed, if there are many distribution
transformers to be installed in a locality).
2. Transformer foundation drawings and the drawings of
Bolts where the transformer will be bolted.
3. Whether to be installed on ground/ On pole
4. Whether oilfilled/ Drytype.
5. If oil filled provision of soakpit and clearances from
firewall.
6. If conservator tank and radiators are there the clearances
7. Provision for grounding.
8. All drawings of transformers from all angles.
Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
How does zener phenomenon differ from avalanche breakdown?
What is the use for cable entry in control room?
For group 1 , 2 whather i have to prepare my technical or general studies etc? and im graduate in ee engg. for wht posts im eligible for? please tell me!
why capacitive load is not used in routine life????any reason is there ??????
What is Phase margin?
What is the difference between vector surge relay (78) and Pole slip relay (98G)
Which device is used for the source of emission of electrons in a crt?
what happens to the supply voltage if there is any change in frequency?
What it the purpose of parallel phasing transfomers??
Hi Everyone ! My Name is Hakim ullah khan please i need formula of Cable Rating because i want to calculate by self without check any Table Chart... Thank you.....
how does a submersible pump work..?
how is the magnetic current test is different in delta-star and delta delta transformer.
what reactive how to maintain
The ripple frequency in output of fullwave bridge rectifier is a. Half the input b. Twice the input c. Same as input
What is shutdown of electrical sub station?