Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


WHAT SHOULD BE THE BEST CURRENT RATINGS (PRIMARY /
SECONDARY)FOR A CT INSTALLED AT THE INCOMING 11KV PANE?
WILL IT BE CALCULATED ON THE BASES OF MAXIMUM DEMANT VALUE
OR ON SUM OF ALL TRANSFORMER'S KVA?
NOMALLY MAX DEMAND REPRESENT THE MAXIMUM OPERATING LOAD OF
THE PLANT AND TOTAL KVA OF (SAY 5 NUMBERS TRANSFORMERS)
REPRESENT THE CONNECTED LOAD. WHICH i.e. MAX DEMAND KVA OR
CONNECTED KVA ARE BETTER TO USE FOR CT CURRENT CALCULATION?
PLEASE ANSWER.


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Electrical Engineering Interview Questions

why delta delta connection generally not use in transformer

4 Answers   Lanco,


what is the necessity of neutral in 3 phase system?

5 Answers  


how to calculate the output power of vfd , please help me.

1 Answers  


What is difference between MCB,MCCB,ELCB and RCCB? Brief description and why RCCB is costly?

3 Answers   JLL,


what is mind in cable

0 Answers   BARC,


What happens if the Capacitive Voltage Transformer Primary neutral is not earthed. There is a CVT between Transformer and source, and the CVT neutral of the transformer is not earthed, does it effect the transformer while charging or does it effect the transformer charging process.

1 Answers  


what is the difference between 11kv and 13.8 kv? why we can't used one of these 2 sources?

2 Answers  


what is stper motor.what is its uses

9 Answers   Bhel, HCL,


How many battery required for an 3kva online ups with 3 hrs back up with usage of 3 fans,3tube lights

1 Answers  


What is I/P converter?

1 Answers   RRDonnelley,


Why HT voltages are expressed in 11KV,22KV,33KV and so on? (ie in times of 11)

3 Answers   Bhel, Park Hotel,


What is shutdown of electrical sub station?

0 Answers   UCEP Bangladesh,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)