Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


which bulb is greater iluminited, 60w and 100w are conected
in series?

Answers were Sorted based on User's Feedback



which bulb is greater iluminited, 60w and 100w are conected in series?..

Answer / sree

so , 2 bulbs 60w and 100w are connected in series connected in series, means current is same for both.60w bulb gives high illumination

Is This Answer Correct ?    20 Yes 3 No

which bulb is greater iluminited, 60w and 100w are conected in series?..

Answer / nagaraju-ch

60w bulb

Is This Answer Correct ?    9 Yes 5 No

Post New Answer

More Electrical Engineering Interview Questions

In PFI plant one stage capacitor connection is directly connected(with out megnetic contact controll). but why?

0 Answers   Aegis,


explain how to protect high rise building from the risk of lighting.

1 Answers  


can any one know is sbi interview based on merit or based on roll number

0 Answers  


if acapacitor connected to power supply will it cosume power& will it going to get recorded in energy meter

2 Answers  


Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

0 Answers   HAL,


Will a 230VAC motor run OK at 208VAC.

7 Answers  


advantages and disadvantages of inverse definite minimum time RELAY

0 Answers  


why frequency should be constant?

2 Answers  


What is the name of the winding to which supply is given?

0 Answers  


what is the diff. b/w restricted earth fault relay & standby earthfault relay and where they are used?

4 Answers   KSK Energy, Reliance,


what is negative phase sequence

1 Answers  


What is electrical diversity factor in electrical installations?

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)