I am selected in OCL(Orissa cement Limited), but they have a Tech PI round their at their plant.Anybody has any idea that what kind of questions they are going to ask??Please guies help me. I am in serious headache.I have heard that huge elimination is done at there.
No Answer is Posted For this Question
Be the First to Post Answer
In Transformer testing at Shop test we normally test for vector group, open ckt.,short ckt. but what are the other test performed for transformer once it reaches at site.For e.g:if the transformer is dry having rating 1000KVA?
how we done power management?
Why Transformer Neutral having one earth pit ( more earth electrode resistance) whereas body have many earth pit ( less earth electrode resistance)?
how is choose &depending upon the load why?
what is the saturation point of crgo lamination.
what is ACB and its function?
What is reason to get a power factor nearly zero in resistive loads
What is the formulae of Megger value for a A.C.Motor
Electrical Design specifications
1 HT service how many LT Service
Connection diagram for KW meter and Kva meter
in pf lagging means current decrease by increasing voltage is correct or not ? reason ?