Required Qty of Cement Mortor for 3"x3"x1' groove filling?
Answers were Sorted based on User's Feedback
Answer / s sambasiva naidu
if it is for wet morter the answer is 108 cub.inches
| Is This Answer Correct ? | 6 Yes | 0 No |
How to Determine the Quantity of Cement Sand , Aggregete and Reinforcement Bars in 30 feet X 40 Feet and Height is 4 Feet .
What is labour rate per kg for cutting,fixing and binding of reinforcement steet..??
3 Answers GKC Projects Limited GKCPL,
Can any body help me out by telling hoe swelling pressure test of soil is carried out ? some body told me the procedure & formula (change in length /116.3*100%) but still i am confused ? pls help.
what is difference between characteristic compressive strength and compressive strength of concrete
why did you choose this career
How much quantity of water required for curing of: 1) For concrete of 10cu-m or 10sq-m 2) For blockwork of 10sq-m 3) For plastering of 10sq-m
What do you understand by “preset” during the installation process of bridge bearings?
1m square 20mm plastering how much of water need curing work
Did you handle any interior designing jobs?
How to check Diameter of Np2 rcc pipe?
how much cement sand n bricks required in im3?and how much in plaster?
How should i calculate Cutting length of haunch bar in a raft including cover?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)