what are your career plans upon completion of the programme
and the relevance of recity generation to your professional
development?
No Answer is Posted For this Question
Be the First to Post Answer
1 no. 22 kV feeder is taken from state electricity board. 350 MVA is the S.C. MVA. now i am feeding this feeder to HT Panel having 2 outgoings which further supply to 2 Transformers. Can you please suggest me the type & rating of cables are 3 of these cables same? or they are different? please help...............
only some transformers and some generator requires NGR why?
two or more transformer are working in parallal,one is out of order,what are you doing?
The error in a single phase energy meter where pressure coil lags behind applied voltage by 88 degrees and pf is 1) upf 2).5lag
can i connect the two phases of scott connected transformer,if not why?
for distribution line ratio of x/r 1.<0.1 2.>10 3.>1 4.<0.01
difference between diode and scr?
DIFFERNCE BETWEEN DCS AND PLC? HOW IT WORKS?
how we can check the CT & VT?
what size steel armoured cable is required to support 1500kva capacity. would 70mm squared be enough or would I need 90 or 120mm squared 3c plus earth
What does Bode plot tell you?
Which of the following connection is best suited for 3-ph, 4 wire system A delta-delta B star-star C delta-star D star-delta
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)