how to find the transformer neutral copper earthing size
Should be able to take at least the full load current continuously
| Is This Answer Correct ? | 0 Yes | 1 No |
state application of relay in transmission line?
Reason of secondary of ct always short
How to take the Vector Group Test in Transformer? What is the purpose of doing Vector Group Test?
What are the two major types of control system?
how can we calculate the cooper armed cable size if the protection load of main fuse is 80 ampere.
Generally at what power factor the electronic equipments like computer, TV, EPABX etc.,operates. Please tell me.
We have three phase dg of 12kva rating.If the load of each phase is not constant.That means one phase drowning more load than remaining two phase..Then what will happen to dg?
Which Current transformer will be bigger in size, 400/5 or 400/1 & why?
how we could know that generator running anti clockwise with seeing the rotating direction of prime mover or engine
how to claculate earth strip size for 1500kVA transformer for neutral and body
WHAT IS THE SHOPE TESTING
On load tap changer (OLTC) explode? Transformer Vector group: Ynd11 Rated Power: 353MVA Rated Current: 693A Voltage:294/20KV OLTC Type: T III Y1000 110/c 12193w Max Operation Current: 295A Step Voltage: 550V Arrangement in Tx windings: Y Connection Problem: Damage of Unit 1 Generator Transformer On Load Tap Changer (OLTC) Description of Incident: 9.00 a.m. :- Generator No Load test on excitation system started 10.30 a.m :- Carried out AVR change over test 11.30 a.m :- Preparation for Generator Manual Synchronizing test 12.00 a.m :- Manual Synshronizing test started. Observed incoming generator voltage higher than running voltage. CECR operator operated Generator Transformer OLTC to bring down the incoming generator voltage 12.03 a.m :-Generator Transformer abnormal alarm operated at Gen.Control Desk (CECR) CECR operater at Generator transformer bay informed that the transformer oil splashed out from OLTC. CECR operater informed that he heard explosion inside OLTC. Observed Oil level & Oil Flow alaram operated at Tranformer local annunciator. 12.05 am :- CECR operator 'Open Gen Field Breaker” 12.10 a.m. :- Elec1 team inspected the OLTC and found the OLTC rupture disk was broken and oil spilled at OLTC area. - Elec1 found the OLTC top cover bulging. Do anyone know why and possibility cause happen in this OLTC.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)