The application test plans are developed in which of the
following systems development life cycle (SDLC) phases?

A. Design

B. Testing

C. Requirement

D. Development



The application test plans are developed in which of the following systems development life cycle (..

Answer / guest

Answer: A

Developing test plans for the various levels of testing is
one of the key activities during the application development
design phase. The test plans are used in the actual software
testing.

Is This Answer Correct ?    6 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

Which of the following types of firewalls provide the GREATEST degree and granularity of control? A. Screening router B. Packet filter C. Application gateway D. Circuit gateway

1 Answers  


In large corporate networks having supply partners across the globe, network traffic may continue to rise. The infrastructure components in such environments should be scalable. Which of the following firewall architectures limits future scalability? A. Appliances B. Operating system based C. Host based D. Demilitarized

1 Answers  


Which of the following independent duties is traditionally performed by the data control group? A. Access to data B. Authorization tables C. Custody of assets D. Reconciliation

1 Answers  


Which of the following types of firewalls would BEST protect a network from an Internet attack? A. Screened subnet firewall B. Application filtering gateway C. Packet filtering router D. Circuit-level gateway

1 Answers  


Which of the following would an IS auditor consider to be the MOST important to review when conducting a business continuity audit? A. A hot site is contracted for and available as needed. B. A business continuity manual is available and current. C. Insurance coverage is adequate and premiums are current. D. Media backups are performed on a timely basis and stored offsite.

1 Answers  






A control for a company that wants to prevent virus-infected programs (or other type of unauthorized modified programs) would be to: A. utilize integrity checkers. B. verify program's lengths. C. backup the source and object code. D. implement segregation of duties.

2 Answers  


In a system development project the purpose of the program and procedure development phase is to: A. prepare, test and document all programs and manual procedures. B. document a business or system problem to a level at which management can select a solution. C. prepare a high-level design of a proposed system solution and present reasons for adopting a solution. D. expand the general design of an approved solution so that program and procedure writing can begin.

1 Answers  


Which of the following exposures associated with the spooling of sensitive reports for offline printing would an IS auditor consider to be the MOST serious? A. Sensitive data can be read by operators. B. Data can be amended without authorization. C. Unauthorized report copies can be printed. D. Output can be lost in the event of system failure.

1 Answers  


IT governance ensures that an organization aligns its IT strategy with: A. Enterprise objectives. B. IT objectives. C. Audit objectives. D. Finance objectives.

2 Answers  


Which of the following would allow a company to extend it?s enterprise?s intranet across the Internet to it?s business partners? A. Virtual private network B. Client-Server C. Dial-Up access D. Network service provider

1 Answers  


A B-to-C e-commerce web site as part of its information security program wants to monitor, detect and prevent hacking activities and alert the system administrator when suspicious activities occur. Which of the following infrastructure components could be used for this purpose? A. Intrusion detection systems B. Firewalls C. Routers D. Asymmetric encryption

1 Answers  


The management of an organization has decided to establish a security awareness program. Which of the following would MOST likely be a part of the program? A. Utilization of an intrusion detection system to report incidents. B. Mandating the use of passwords to access all software. C. Installing an efficient user log system to track the actions of each user D. Provide training on a regular basis to all current and new employees.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)