The application test plans are developed in which of the
following systems development life cycle (SDLC) phases?

A. Design

B. Testing

C. Requirement

D. Development



The application test plans are developed in which of the following systems development life cycle (..

Answer / guest

Answer: A

Developing test plans for the various levels of testing is
one of the key activities during the application development
design phase. The test plans are used in the actual software
testing.

Is This Answer Correct ?    6 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

Which of the following exposures associated with the spooling of sensitive reports for offline printing would an IS auditor consider to be the MOST serious? A. Sensitive data can be read by operators. B. Data can be amended without authorization. C. Unauthorized report copies can be printed. D. Output can be lost in the event of system failure.

1 Answers  


During an audit, an IS auditor learns that lengthy and complex passwords are required to reach the network via modem. These passwords were established by an outside provider. The communications software allows users to select a ?remember password? option. What should the IS auditor's PRIMARY recommendation be? A. Disable the save password option and have users record them elsewhere. B. Request that the provider change the dial-in password to a group password. C. Establish and enforce a process to have users change their passwords. D. Allow users to change their passwords to something less complex.

1 Answers  


When reviewing the quality of an IS department's development process, the IS auditor finds that they do not use any formal, documented methodology and standards. The IS auditor's MOST appropriate action would be to: A. complete the audit and report the finding. B. investigate and recommend appropriate formal standards. C. document the informal standards and test for compliance. D. withdraw and recommend a further audit when standards are implemented.

1 Answers  


Which of the following is MOST important to have provided for in a disaster recovery plan? A. Backup of compiled object programs B. Reciprocal processing agreement C. Phone contact list D. Supply of special forms

1 Answers  


Which of the following is the MOST important function to be performed by IS management when a service has been outsource? A. Ensuring that invoices are paid to the provider B. Participating in systems design with the provider C. Renegotiating the provider's fees D. Monitoring the outsourcing provider's performance

2 Answers  






Which of the following forms of evidence for the auditor would be considered the MOST reliable? A. An oral statement from the auditee B. The results of a test performed by an IS auditor C. An internally generated computer accounting report D. A confirmation letter received from an outside source

2 Answers  


Which of the following is the MOST critical and contributes the MOST to the quality of data in a data warehouse? A. Accuracy of the source data B. Credibility of the data source C. Accuracy of the extraction process D. Accuracy of the data transformation

1 Answers  


An IS auditor evaluates the test results of a modification to a system that deals with payment computation. The auditor finds that 50 percent of the calculations do not match predetermined totals. Which of the following would MOST likely be the next step in the audit? A. Design further tests of the calculations that are in error. B. Identify variables that may have caused the test results to be inaccurate. C. Examine some of the test cases to confirm the results. D. Document the results and prepare a report of findings, conclusions and recommendations.

1 Answers  


IT governance ensures that an organization aligns its IT strategy with: A. Enterprise objectives. B. IT objectives. C. Audit objectives. D. Finance objectives.

2 Answers  


Which of the ISO/OSI model layers provides for routing packets between nodes? A. Data link B. Network C. Transport D. Session

1 Answers   Network,


Which of the following activities should the business continuity manager perform FIRST after the replacement of hardware at the primary information processing facility? A. Verify compatibility with the hot site. B. Review the implementation report. C. Perform a walk-through of the DRP. D. Update the IS assets inventory.

1 Answers  


An organization has contracted with a vendor for a turnkey solution for their electronic toll collection system (ETCS). The vendor has provided its proprietary application software as part of the solution. The contract should require that: A. a backup server be available to run ETCS operations with up-to-date data. B. a backup server be loaded with all the relevant software and data. C. the systems staff of the organization be trained to handle any event. D. source code of the ETCS application be placed in escrow.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)