Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Which of the following is the MOST reasonable option for
recovering a noncritical system?

A. Warm site

B. Mobile site

C. Hot site

D. Cold site

Answers were Sorted based on User's Feedback



Which of the following is the MOST reasonable option for recovering a noncritical system? A. War..

Answer / guest

Answer: D

Generally a cold site is contracted for a longer period at a
lower cost. Since it requires more time to make a cold site
operational, it is used generally for noncritical
applications. A warm site is generally available at a medium
cost, requires less time to become operational and is
suitable for sensitive operations. A mobile site is a
vehicle ready with all necessary computer equipment and it
can be moved to any cold or warm site depending upon the
need. The need for a mobile site depends upon the scale of
operations and a hot site is contracted for a shorter time
period at a higher cost and is better suited for recovery of
vital and critical applications.

Is This Answer Correct ?    11 Yes 5 No

Which of the following is the MOST reasonable option for recovering a noncritical system? A. War..

Answer / davinder

its C

Is This Answer Correct ?    1 Yes 3 No

Post New Answer

More CISA Certification Interview Questions

An IS auditor performing a review of the backup processing facilities should be MOST concerned that: A. adequate fire insurance exists. B. regular hardware maintenance is performed. C. offsite storage of transaction and master files exists. D. backup processing facilities are tested fully.

1 Answers  


An organization's disaster recovery plan should address early recovery of: A. all information systems processes. B. all financial processing applications. C. only those applications designated by the IS manager. D. processing in priority order, as defined by business management.

1 Answers  


An organization is considering connecting a critical PC-based system to the Internet. Which of the following would provide the BEST protection against hacking? A. An application-level gateway B. A remote access server C. A proxy server D. Port scanning

2 Answers  


The most common problem in the operation of an intrusion detection system (IDS) is: A. the detection of false positives. B. receiving trap messages. C. reject error rates. D. denial-of-service attacks.

1 Answers   ABC,


A distinction that can be made between compliance testing and substantive testing is that compliance testing tests: A. details, while substantive testing tests procedures. B. controls, while substantive testing tests details. C. plans, while substantive testing tests procedures. D. for regulatory requirements, while substantive testing tests validations.

3 Answers  


The risk that an IS auditor uses an inadequate test procedure and concludes that material errors do not exist when, in fact, they do, is an example of: A. inherent risk. B.control risk. C. detection risk. D. audit risk.

1 Answers  


Which of the following is the MOST effective type of antivirus software to detect an infected application? A. Scanners B. Active monitors C. Integrity checkers D. Vaccines

1 Answers  


If the decision has been made to acquire software rather than develop it internally, this decision is normally made during the: A. requirements definition phase of the project. B. feasibility study phase of the project. C. detailed design phase of the project. D. programming phase of the project.

1 Answers  


As a business process reengineering (BPR) project takes hold it is expected that: A. business priorities will remain stable. B. information technologies will not change. C. the process will improve product, service and profitability. D. input from clients and customers will no longer be necessary.

3 Answers  


Which of the following is a control over database administration activities? A. A database checkpoint to restart processing after a system failure B. Database compression to reduce unused space C. Supervisory review of access logs D. Backup and recovery procedures to ensure database availability

1 Answers  


Which tests is an IS auditor performing when certain program is selected to determine if the source and object versions are the same?

4 Answers  


Which of the following would be the BEST population to take a sample from when testing program changes? A. Test library listings B. Source program listings C. Program change requests D. Production library listings

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)