Which of the following statements relating to packet
switching networks is CORRECT?
A. Packets for a given message travel the same route.
B. Passwords cannot be embedded within the packet.
C. Packet lengths are variable and each packet contains the
same amount of information.
D. The cost charged for transmission is based on packet, not
distance or route traveled.
Answer / guest
Answer: D
D is the correct answer since transmission charges are based
on packets transmitted, not the distance or route traveled.
Passwords and other data can be placed within a packet
making choice B incorrect. Choices A and C are not correct
because a complete message is broken into transmission units
(packets), which are routed individually through the network.
| Is This Answer Correct ? | 4 Yes | 0 No |
An offsite information processing facility having electrical wiring, air conditioning and flooring, but no computer or communications equipment is a: A. cold site. B. warm site. C. dial-up site. D. duplicate processing facility.
Which of the following would an IS auditor consider a weakness when performing an audit of an organization that uses a public key infrastructure with digital certificates for its business-to-consumer transactions via the Internet? A. Customers are widely dispersed geographically, but not the certificate authorities. B. Customers can make their transactions from any computer or mobile device. C. The certificate authority has several data processing subcenters to administrate certificates. D. The organization is the owner of the certificate authority.
Which of the following audit procedures would an IS auditor normally perform FIRST when reviewing an organization's systems development methodology? A. Determine procedural adequacy. B. Analyze procedural effectiveness. C. Evaluate level of compliance with procedures. D. Compare established standards to observed procedures.
Before reporting results of an audit to senior management, an IS auditor should: A. Confirm the findings with auditees. B. Prepare an executive summary and send it to auditee management. C. Define recommendations and present the findings to the audit committee. D. Obtain agreement from the auditee on findings and actions to be taken.
In a system development project the purpose of the program and procedure development phase is to: A. prepare, test and document all programs and manual procedures. B. document a business or system problem to a level at which management can select a solution. C. prepare a high-level design of a proposed system solution and present reasons for adopting a solution. D. expand the general design of an approved solution so that program and procedure writing can begin.
Which of the following has the LEAST effect on controlling physical access? A. Access to the work area is restricted through a swipe card. B. All physical assets have an identification tag and are properly recorded. C. Access to the premises is restricted and all visitors authorized for entry. D. Visitors are issued a pass and escorted in and out by a concerned employee.
A goal of processing controls is to ensure that: A. the data are delivered without compromised confidentiality. B. all transactions are authorized. C. accumulated data are accurate and complete through authorized routines. D. only authorized individuals perform sensitive functions.
The difference between a vulnerability assessment and a penetration test is that a vulnerability assessment: A. searches and checks the infrastructure to detect vulnerabilities, whereas penetration testing intends to exploit the vulnerabilities to probe the damage that could result from the vulnerabilities. B. and penetration tests are different names for the same activity. C. is executed by automated tools, whereas penetration testing is a totally manual process. D. is executed by commercial tools, whereas penetration testing is executed by public processes.
Which of the following network topologies yields the GREATEST redundancy in the event of the failure of one node? A. Mesh B. Star C. Ring D. Bus
An organization has contracted with a vendor for a turnkey solution for their electronic toll collection system (ETCS). The vendor has provided its proprietary application software as part of the solution. The contract should require that: A. a backup server be available to run ETCS operations with up-to-date data. B. a backup server be loaded with all the relevant software and data. C. the systems staff of the organization be trained to handle any event. D. source code of the ETCS application be placed in escrow.
An organization is moving its application maintenance in-house from an outside source. Which of the following should be the main concern of an IS auditor? A. Regression testing B. Job scheduling C. User manuals D. Change control procedures
Which of the following is the FIRST step in a business process reengineering (BPR) project? A. Defining the areas to be reviewed B. Developing a project plan C. Understanding the process under review D. Reengineering and streamlining the process under review