Which of the following BEST describes the early stages of an
IS audit?
A. Observing key organizational facilities.
B. Assessing the IS environment.
C. Understanding business process and environment applicable
to the review.
D. Reviewing prior IS audit reports.
Answer / guest
Answer: C
Understanding the business process and environment
applicable to the review is most representative of what
occurs early on, in the course of an audit. Other choices
relate to activities actually occurring within this process.
| Is This Answer Correct ? | 14 Yes | 1 No |
Which of the following audit procedures would MOST likely be used in an audit of a systems development project? A. Develop test transactions B. Use code comparison utilities C. Develop audit software programs D. Review functional requirements documentation
Which of the following is a strength of a client-server security system? A. Change control and change management procedures are inherently strong. B. Users can manipulate data without controlling resources on the mainframe. C. Network components seldom become obsolete. D. Access to confidential data or data manipulation is controlled tightly.
An IS auditor is assigned to perform a post implementation review of an application system. Which of the following situations may have impaired the independence of the IS auditor? The IS auditor: A. implemented a specific control during the development of the application system. B. designed an embedded audit module exclusively for auditing the application system. C. participated as a member of the application system project team, but did not have operational responsibilities. D.provided consulting advice concerning application system best practices.
The MOST important responsibility of a data security officer in an organization is: A. recommending and monitoring data security policies. B. promoting security awareness within the organization. C. establishing procedures for IT security policies. D. administering physical and logical access controls.
Which of the following ensures completeness and accuracy of accumulated data? A. Processing control procedures B. Data file control procedures C. Output controls D. Application controls
A data administrator is responsible for: A. maintaining database system software. B. defining data elements, data names and their relationship. C. developing physical database structures. D. developing data dictionary system software.
An offsite information processing facility having electrical wiring, air conditioning and flooring, but no computer or communications equipment is a: A. cold site. B. warm site. C. dial-up site. D. duplicate processing facility.
A validation which ensures that input data are matched to predetermined reasonable limits or occurrence rates, is known as: A. Reasonableness check. B. Validity check. C. Existence check. D. Limit check.
An IS auditor performing a review of the IS department discovers that formal project approval procedures do not exist. In the absence of these procedures the IS manager has been arbitrarily approving projects that can be completed in a short duration and referring other more complicated projects to higher levels of management for approval. The IS auditor should recommend as a FIRST course of action that: A. users participate in the review and approval process. B. formal approval procedures be adopted and documented. C. projects be referred to appropriate levels of management for approval. D. the IS manager's job description be changed to include approval authority.
Which of the following is the MOST secure and economical method for connecting a private network over the Internet in a small- to medium-sized organization? A. Virtual private network B. Dedicated line C. Leased line D. Integrated services digital network
A team conducting a risk analysis is having difficulty projecting the financial losses that could result from a risk. To evaluate the potential losses the team should: A. compute the amortization of the related assets. B. calculate a return on investment (ROI). C. apply a qualitative approach. D. spend the time needed to define exactly the loss amount.
Which of the following is a measure of the size of an information system based on the number and complexity of a system?s inputs, outputs and files? A. Function point (FP) B. Program evaluation review technique (PERT) C. Rapid application design (RAD) D. Critical path method (CPM)