Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


When auditing the requirements phase of a system development
project, an IS auditor would:

A. assess the adequacy of audit trails.

B. identify and determine the criticality of the need.

C. verify cost justifications and anticipated benefits.

D. ensure that control specifications have been defined.



When auditing the requirements phase of a system development project, an IS auditor would: A. as..

Answer / guest

Answer: D

During the requirements phase the IS auditor should verify
the detailed requirements definition document. The IS
auditor would identify and determine the criticality of the
need and verify all cost justifications/benefits during the
feasibility phase. The assessment of the adequacy of audit
trails would take place during the detailed design and
programming phase.

Is This Answer Correct ?    5 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

An installed Ethernet cable run in an unshielded twisted pair (UTP) network is more than 100 meters long. Which of the following could be caused by the length of the cable? A. Electromagnetic interference (EMI) B. Cross talk C. Dispersion D.Attenuation

2 Answers  


If inadequate, which of the following would be the MOST likely contributor to a denial-of-service attack? A. Router configuration and rules B. Design of the internal network C. Updates to the router system software D. Audit testing and review techniques

2 Answers  


Detection risk refers to: A. concluding that material errors do not exist, when in fact they do. B. controls that fail to detect an error. C. controls that detect high-risk errors. D. detecting an error but failing to report it.

1 Answers  


The PRIMARY reason for separating the test and development environments is to: A. restrict access to systems under test. B. segregate user and development staff. C. control the stability of the test environment. D. secure access to systems under development.

1 Answers  


An organization is considering installing a LAN in a site under construction. If system availability is the main concern, which of the following topologies is MOST appropriate? A. Ring B. Line C. Star D. Bus

1 Answers  


An IS auditor performing an application maintenance audit would review the log of program changes for the: A. authorization for program changes. B. creation date of a current object module. C. number of program changes actually made. D. creation date of a current source program.

1 Answers  


As a result of a business process reengineering (BPR) project: A. an IS auditor would be concerned with the key controls that existed in the prior business process and not those in the new process. B. system processes are automated in such a way that there are more manual interventions and manual controls. C. the newly designed business processes usually do not involve changes in the way(s) of doing business. D. advantages usually are realized when the reengineering process appropriately suits the business and risk.

1 Answers  


Digital signatures require the: A. signer to have a public key and the receiver to have a private key. B. signer to have a private key and the receiver to have a public key. C. signer and receiver to have a public key. D. signer and receiver to have a private key.

1 Answers  


Which of the following would normally be found in application run manuals? A. Details of source documents B. Error codes and their recovery actions C. Program flowcharts and file definitions D. Change records for the application source code

1 Answers  


An IS auditor is performing an audit of a network operating system. Which of the following is a user feature the IS auditor should review? A. Availability of online network documentation B. Support of terminal access to remote hosts C. Handling file transfer between hosts and inter-user communications D. Performance management, audit and control

1 Answers  


hello all i want to do cisa certification but dont have knowledge of auditing. i m fresher and ccna certified. so, please advice me how should i prepare .and having cisa certification is it easy to get a job. please reply as soon as possible.

1 Answers  


An IS auditor evaluates the test results of a modification to a system that deals with payment computation. The auditor finds that 50 percent of the calculations do not match predetermined totals. Which of the following would MOST likely be the next step in the audit? A. Design further tests of the calculations that are in error. B. Identify variables that may have caused the test results to be inaccurate. C. Examine some of the test cases to confirm the results. D. Document the results and prepare a report of findings, conclusions and recommendations.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)