Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


When auditing the requirements phase of a system development
project, an IS auditor would:

A. assess the adequacy of audit trails.

B. identify and determine the criticality of the need.

C. verify cost justifications and anticipated benefits.

D. ensure that control specifications have been defined.



When auditing the requirements phase of a system development project, an IS auditor would: A. as..

Answer / guest

Answer: D

During the requirements phase the IS auditor should verify
the detailed requirements definition document. The IS
auditor would identify and determine the criticality of the
need and verify all cost justifications/benefits during the
feasibility phase. The assessment of the adequacy of audit
trails would take place during the detailed design and
programming phase.

Is This Answer Correct ?    5 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

A team conducting a risk analysis is having difficulty projecting the financial losses that could result from a risk. To evaluate the potential losses the team should: A. compute the amortization of the related assets. B. calculate a return on investment (ROI). C. apply a qualitative approach. D. spend the time needed to define exactly the loss amount.

1 Answers  


The PKI element that manages the certificate life cycle, including certificate directory maintenance and certificate revocation list (CRL) maintenance and publication is the: A. certificate authority. B. digital certificate. C. certification practice statement. D. registration authority.

2 Answers  


A company uses a bank to process its weekly payroll. Time sheets and payroll adjustment forms (e.g., hourly rate changes, terminations) are completed and delivered to the bank, which prepares checks (cheques) and reports for distribution. To BEST ensure payroll data accuracy: A. payroll reports should be compared to input forms. B. gross payroll should be recalculated manually. C. checks (cheques) should be compared to input forms. D. checks (cheques) should be reconciled with output reports.

1 Answers  


A web-based bookstore has included the customer relationship management (CRM) system in its operations. An IS auditor has been assigned to perform a call center review. Which of the following is the MOST appropriate first step for the IS auditor to take? A. Review the company's performance since the CRM was implemented. B. Review the IT strategy. C. Understand the business focus of the bookstore. D. Interview salespeople and supervisors.

1 Answers  


Which of the following is the PRIMARY safeguard for securing software and data within an information processing facility? A. Security awareness B. Reading the security policy C. Security committee D. Logical access controls

1 Answers  


Congestion control is BEST handled by which OSI layer? A. Data link B. Session layer C. Transport layer D. Network layer

3 Answers  


In a system development project the purpose of the program and procedure development phase is to: A. prepare, test and document all programs and manual procedures. B. document a business or system problem to a level at which management can select a solution. C. prepare a high-level design of a proposed system solution and present reasons for adopting a solution. D. expand the general design of an approved solution so that program and procedure writing can begin.

1 Answers  


When an IS auditor obtains a list of current users with access to a WAN/LAN and verifies that those listed are active associates, the IS auditor is performing a: A. compliance test. B. substantive test. C. statistical sample. D. risk assessment.

1 Answers  


Electronic signatures can prevent messages from being: A. suppressed. B. repudiated. C. disclosed. D. copied.

1 Answers  


At the end of the testing phase of software development, an IS auditor observes that an intermittent software error has not been corrected. No action has been taken to resolve the error. The IS auditor should: A. report the error as a finding and leave further exploration to the auditee's discretion. B. attempt to resolve the error. C. recommend that problem resolution be escalated. D. ignore the error, as it is not possible to get objective evidence for the software error.

1 Answers  


Which of the following would an IS auditor consider to be the MOST helpful when evaluating the effectiveness and adequacy of a computer preventive maintenance program? A. A system downtime log B. Vendors' reliability figures C. Regularly scheduled maintenance log D. A written preventive maintenance schedule

1 Answers  


Without causing a conflict of interest, a duty compatible with those of a security administrator would be: A. quality assurance. B. application programming. C. systems programming. D. data entry.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)