Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Which of the following is MOST likely to occur when a system
development project is in the middle of the
programming/coding phase?

A. Unit tests

B. Stress tests

C. Regression tests

D. Acceptance tests



Which of the following is MOST likely to occur when a system development project is in the middle o..

Answer / guest

Answer: A

During the programming phase, the development team should
have mechanisms in place to ensure that coding is being
developed to standard and is working correctly. Unit tests
are key elements of that process in that they ensure that
individual programs are working correctly. They would
normally be supported by code reviews. Stress tests,
regression tests and acceptance testing would normally occur
later in the development and testing phases. As part of the
process of assessing compliance with quality processes, IS
auditors should verify that such reviews are undertaken.

Is This Answer Correct ?    6 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

The risk of an IS auditor using an inadequate test procedure and concluding that material errors do not exist when, in fact, they exist is:

6 Answers  


When developing a risk management program, the FIRST activity to be performed is a/an: A. threats assessment. B. classification of data. C. inventory of assets. D. criticality analysis.

1 Answers  


An IS auditor who is participating in a systems development project should: A. recommend appropriate control mechanisms regardless of cost. B. obtain and read project team meeting minutes to determine the status of the project. C. ensure that adequate and complete documentation exists for all project phases. D. not worry about his/her own ability to meet target dates since work will progress regardless.

1 Answers  


In planning an audit, the MOST critical step is the identification of the:

6 Answers   Oracle,


Which of the following exposures could be caused by a line-grabbing technique? A. Unauthorized data access B. Excessive CPU cycle usage C. Lockout of terminal polling D. Multiplexor control dysfunction

1 Answers   Samsung,


An IS auditor observed that some data entry operators leave their computers in the midst of data entry without logging off. Which of the following controls should be suggested to prevent unauthorized access? A. Encryption B. Switch off the computer when leaving C. Password control D. Screen saver password

1 Answers  


A sequence of bits appended to a digital document that is used to secure an e-mail sent through the Internet is called a: A. digest signature. B. electronic signature. C. digital signature. D. hash signature.

1 Answers  


Which of the following would be MOST appropriate to ensure the confidentiality of transactions initiated via the Internet? A. Digital signature B. Data encryption standard (DES) C. Virtual private network (VPN) D. Public key encryption

1 Answers  


Which of the following is the MOST critical for the successful implementation and maintenance of a security policy? A. Assimilation of the framework and intent of a written security policy by all appropriate parties B. Management support and approval for the implementation and maintenance of a security policy C. Enforcement of security rules by providing punitive actions for any violation of security rules D. Stringent implementation, monitoring and enforcing of rules by the security officer through access control software

1 Answers  


When auditing the proposed acquisition of a new computer system, the IS auditor should FIRST establish that: A. a clear business case has been approved by management. B. corporate security standards will be met. C. users will be involved in the implementation plan. D. the new system will meet all required user functionality.

2 Answers  


A team conducting a risk analysis is having difficulty projecting the financial losses that could result from a risk. To evaluate the potential losses the team should: A. compute the amortization of the related assets. B. calculate a return on investment (ROI). C. apply a qualitative approach. D. spend the time needed to define exactly the loss amount.

1 Answers  


When reviewing a system development project at the project initiation stage, an IS auditor finds that the project team is following the organization's quality manual. To meet critical deadlines the project team proposes to fast track the validation and verification processes, commencing some elements before the previous deliverable is signed off. Under these circumstances, the IS auditor would MOST likely: A. report this as a critical finding to senior management. B. accept that different quality processes can be adopted for each project. C. report to IS management the team's failure to follow quality procedures. D. report the risks associated with fast tracking to the project steering committee.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)