Write the programming software name for LG, SIEMENS,Messung,AB
No Answer is Posted For this Question
Be the First to Post Answer
what happens when we apply dc to a transformer
Why two main buses and one transfer bus scheme not using for 400kV switchyard
phase clearance between phase to phase and earth
why dont we connect the two 12 V DC batteries in parallel, for an inverter (UPS)? is there any harm ?
Can we put 3 layers of cable tray while installing tray
if dc excitation is used to produce manetic flux in rotating machines then ehy it is not used in transformers.
what is MEMS and any one of it applications?
why we are discharging h.t supply during shutdown time
Draw a 230kv two-bus bar system showing the following. 1.Two generators (150MW) each connected through one 15.75/230KV transformers 2. 1 outgoing lines 3. Two 230/130 KV transformers 4. BUS PT's 5. CT
why transformers are put with supply for 24 hours before giving supplying to a locality?
what is the purpose of fuse?
slipring induction motor starting time Lrs operating why lrs starting time lrs outer body didn't get shock
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)