Which of the following can be used to verify output results
and control totals by matching them against the input data
and control totals?
A. Batch header forms
B. Batch balancing
C. Data conversion error corrections
D. Access controls over print spools
Answer / guest
Answer: B
"Batch balancing is used to verify output results and
control totals by matching them against the input data and
control totals. Batch header forms control data preparation
data conversion error corrections correct errors that occur
due to duplication of transactions and inaccurate data entry
and access controls over print spools prevent reports from
being accidentally deleted form print spools or directed to
a different printer."
| Is This Answer Correct ? | 5 Yes | 0 No |
A key element in a risk analysis is/are: A. audit planning. B. controls. C. vulnerabilities. D. liabilities.
In regard to moving an application program from the test environment to the production environment, the BEST control would be provided by having the: A. application programmer copy the source program and compiled object module to the production libraries. B. as paul says, C. production control group compile the object module to the production libraries using the source program in the test environment. D. production control group copy the source program to the production libraries and then compile the program.
When developing a risk-based audit strategy, an IS auditor should conduct a risk assessment to ensure that:
In a TCP/IP-based network, an IP address specifies a: A. network connection. B. router/gateway. C. computer in the network. D. device on the network.
Which of the following exposures associated with the spooling of sensitive reports for offline printing would an IS auditor consider to be the MOST serious? A. Sensitive data can be read by operators. B. Data can be amended without authorization. C. Unauthorized report copies can be printed. D. Output can be lost in the event of system failure.
When reviewing the implementation of a LAN the IS auditor should FIRST review the: A. node list. B. acceptance test report. C. network diagram. D. user's list.
An organization is introducing a single sign-on (SSO) system. Under the SSO system, users will be required to enter only one user ID and password for access to all application systems. Under the SSO system, unauthorized access: A. is less likely. B. is more likely. C. will have a greater impact. D. will have a smaller impact.
Which of the following is the MOST effective type of antivirus software? A. Scanners B. Active monitors C. Integrity checkers D. Vaccines
A MAJOR risk of using single sign-on (SSO) is that it: A. has a single authentication point. B. represents a single point of failure. C. causes an administrative bottleneck. D. leads to a lockout of valid users.
An IS auditor performing a review of the IS department discovers that formal project approval procedures do not exist. In the absence of these procedures the IS manager has been arbitrarily approving projects that can be completed in a short duration and referring other more complicated projects to higher levels of management for approval. The IS auditor should recommend as a FIRST course of action that: A. users participate in the review and approval process. B. formal approval procedures be adopted and documented. C. projects be referred to appropriate levels of management for approval. D. the IS manager's job description be changed to include approval authority.
Without causing a conflict of interest, a duty compatible with those of a security administrator would be: A. quality assurance. B. application programming. C. systems programming. D. data entry.
When auditing the requirements phase of a software acquisition, the IS auditor should: A. assess the feasibility of the project timetable. B. assess the vendor?s proposed quality processes. C. ensure that the best software package is acquired. D. review the completeness of the specifications.