Which of the following functions, if combined, would be the
GREATEST risk to an organization?

A. Systems analyst and database administrator

B. Quality assurance and computer operator

C. Tape librarian and data entry clerk

D. Application programmer and tape librarian

Answers were Sorted based on User's Feedback



Which of the following functions, if combined, would be the GREATEST risk to an organization? A...

Answer / guest

Answer: D

Application programmers should not have access to system
program libraries. All other combinations, although not
preferred, would normally include some type of compensating
control to mitigate the lack of separation of duties.

Is This Answer Correct ?    2 Yes 1 No

Which of the following functions, if combined, would be the GREATEST risk to an organization? A...

Answer / jc

A

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More CISA Certification Interview Questions

Which of the following procedures would BEST determine whether adequate recovery/restart procedures exist? A. Reviewing program code B. Reviewing operations documentation C. Turning off the UPS, then the power D. Reviewing program documentation

1 Answers  


Before reporting results of an audit to senior management, an IS auditor should: A. Confirm the findings with auditees. B. Prepare an executive summary and send it to auditee management. C. Define recommendations and present the findings to the audit committee. D. Obtain agreement from the auditee on findings and actions to be taken.

1 Answers   TPA,


Which of the following would normally be found in application run manuals? A. Details of source documents B. Error codes and their recovery actions C. Program flowcharts and file definitions D. Change records for the application source code

1 Answers  


Which of the following can consume valuable network bandwidth? A. Trojan horses B. Trap doors C. Worms D. Vaccines

1 Answers  


Confidential data stored on a laptop is BEST protected by: A. storage on optical disks. B. logon ID and password. C. data encryption. D. physical locks.

1 Answers  






In regard to moving an application program from the test environment to the production environment, the BEST control would be provided by having the: A. application programmer copy the source program and compiled object module to the production libraries. B. as paul says, C. production control group compile the object module to the production libraries using the source program in the test environment. D. production control group copy the source program to the production libraries and then compile the program.

1 Answers  


Which of the following normally would be the MOST reliable evidence for an auditor? A. A confirmation letter received from a third party verifying an account balance B. Assurance from line management that an application is working as designed C. Trend data obtained from World Wide Web (Internet) sources D. Ratio analysis developed by the IS auditor from reports supplied by line management

1 Answers  


Which of the following would be the BEST population to take a sample from when testing program changes? A. Test library listings B. Source program listings C. Program change requests D. Production library listings

1 Answers  


An IS auditor has been assigned to conduct a test that compares job run logs to computer job schedules. Which of the following observations would be of the GREATEST concern to the IS auditor? A. There are a growing number of emergency changes. B. There were instances when some jobs were not completed on time. C. There were instances when some jobs were overridden by computer operators. D. Evidence shows that only scheduled jobs were run.

1 Answers  


During which of the following phases in systems development would user acceptance test plans normally be prepared? A. Feasibility study B. Requirements definition C. Implementation planning D. Post-implementation review

1 Answers  


Using test data as part of a comprehensive test of program controls in a continuous online manner is called a/an: A. test data/deck. B. base case system evaluation. C. integrated test facility (ITF). D. parallel simulation.

1 Answers  


The reason for having controls in an IS environment: A. remains unchanged from a manual environment, but the implemented control features may be different. B. changes from a manual environment, therefore the implemented control features may be different. C. changes from a manual environment, but the implemented control features will be the same. D. remains unchanged from a manual environment and the implemented control features will also be the same.

2 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)