The use of a GANTT chart can:

A. aid in scheduling project tasks.

B. determine project checkpoints.

C. ensure documentation standards.

D. direct the post-implementation review.

Answers were Sorted based on User's Feedback



The use of a GANTT chart can: A. aid in scheduling project tasks. B. determine project checkpo..

Answer / guest

Answer: A

A GANTT chart is used in project control. It may aid in the
identification of needed checkpoints but its primary use is
in scheduling. It will not ensure the completion of
documentation nor will it provide direction for the
post-implementation review.

Is This Answer Correct ?    10 Yes 0 No

The use of a GANTT chart can: A. aid in scheduling project tasks. B. determine project checkpo..

Answer / guest

A. aid in scheduling project tasks.

Is This Answer Correct ?    3 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

Detection risk refers to: A. concluding that material errors do not exist, when in fact they do. B. controls that fail to detect an error. C. controls that detect high-risk errors. D. detecting an error but failing to report it.

1 Answers  


Which of the following functions, if performed by scheduling and operations personnel, would be in conflict with a policy requiring a proper segregation of duties? A. Job submission B. Resource management C. Code correction D. Output distribution

1 Answers  


Which of the following is a measure of the size of an information system based on the number and complexity of a system?s inputs, outputs and files? A. Function point (FP) B. Program evaluation review technique (PERT) C. Rapid application design (RAD) D. Critical path method (CPM)

2 Answers  


In the ISO/OSI model, which of the following protocols is the FIRST to establish security for the user application? A. Session layer. B. Transport layer C. Network layer D. Presentation layer

1 Answers  


An IS auditor is performing an audit of a network operating system. Which of the following is a user feature the IS auditor should review? A. Availability of online network documentation B. Support of terminal access to remote hosts C. Handling file transfer between hosts and inter-user communications D. Performance management, audit and control

1 Answers  






Failure to adequately define or manage the requirements for a system can result in a number of risks. The GREATEST risk is: A. inadequate user involvement. B. inadequate allocation of resources. C. scope creep. D. an incorrect estimation of the critical path.

1 Answers  


The success of control self-assessment (CSA) depends highly on: A. Having line managers assume a portion of the responsibility for control monitoring. B. Assigning staff managers the responsibility for building, but not monitoring, controls. C. The implementation of stringent control policy and rule- driven controls. D. The implementation of supervision and the monitoring of control assigned duties

2 Answers  


Which of the following is an example of a passive attack, initiated through the Internet? A. Traffic analysis B. Masquerading C. Denial of service D. E-mail spoofing

2 Answers  


When reviewing the quality of an IS department's development process, the IS auditor finds that they do not use any formal, documented methodology and standards. The IS auditor's MOST appropriate action would be to: A. complete the audit and report the finding. B. investigate and recommend appropriate formal standards. C. document the informal standards and test for compliance. D. withdraw and recommend a further audit when standards are implemented.

1 Answers  


An IS auditor has just completed a review of an organization that has a mainframe and a client-server environment where all production data reside. Which of the following weaknesses would be considered the MOST serious? A. The security officer also serves as the database administrator (DBA.) B. Password controls are not administered over the client/server environment. C. There is no business continuity plan for the mainframe system?s non-critical applications. D. Most LANs do not back up file server fixed disks regularly.

1 Answers  


An IS auditor reviews an organization chart PRIMARILY for: A. an understanding of workflows. B. investigating various communication channels. C. understanding the responsibilities and authority of individuals. D. investigating the network connected to different employees.

1 Answers  


There are several methods of providing telecommunications continuity. The method of routing traffic through split cable or duplicate cable facilities is: A. alternative routing. B. diverse routing. C. long-haul network diversity. D. last mile circuit protection.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)