The use of a GANTT chart can:

A. aid in scheduling project tasks.

B. determine project checkpoints.

C. ensure documentation standards.

D. direct the post-implementation review.

Answers were Sorted based on User's Feedback



The use of a GANTT chart can: A. aid in scheduling project tasks. B. determine project checkpo..

Answer / guest

Answer: A

A GANTT chart is used in project control. It may aid in the
identification of needed checkpoints but its primary use is
in scheduling. It will not ensure the completion of
documentation nor will it provide direction for the
post-implementation review.

Is This Answer Correct ?    10 Yes 0 No

The use of a GANTT chart can: A. aid in scheduling project tasks. B. determine project checkpo..

Answer / guest

A. aid in scheduling project tasks.

Is This Answer Correct ?    3 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

LANs: A. protect against virus infection. B. protect against improper disclosure of data. C. provide program integrity from unauthorized changes. D. provide central storage for a group of users.

1 Answers  


Which of the following is an IS control objective? A. Output reports are locked in a safe place. B. Duplicate transactions do not occur. C. System backup/recovery procedures are updated periodically. D. System design and development meet users' requirements.

1 Answers  


In a small organization, an employee performs computer operations and, when the situation demands, program modifications. Which of the following should the IS auditor recommend? A. Automated logging of changes to development libraries B. Additional staff to provide separation of duties C. Procedures that verify that only approved program changes are implemented D. Access controls to prevent the operator from making program modifications

1 Answers  


The MOST effective method for limiting the damage of an attack by a software virus is: A. software controls. B. policies, standards and procedures. C. logical access controls. D. data communication standards.

1 Answers  


Business continuity/disaster recovery is PRIMARILY the responsibility of: A. IS management. B. business unit managers. C. the security administrator. D. the board of directors.

1 Answers  






The intent of application controls is to ensure that when inaccurate data is entered into the system, the data is: A. accepted and processed. B. accepted and not processed. C. not accepted and not processed. D. not accepted and processed.

1 Answers  


An organization is developing a new business system. Which of the following will provide the MOST assurance that the system provides the required functionality? A. Unit testing B. Regression testing C. Acceptance testing D. Integration testing

1 Answers  


An organization is introducing a single sign-on (SSO) system. Under the SSO system, users will be required to enter only one user ID and password for access to all application systems. Under the SSO system, unauthorized access: A. is less likely. B. is more likely. C. will have a greater impact. D. will have a smaller impact.

1 Answers  


To prevent an organization's computer systems from becoming part of a distributed denial-of-service attack, IP packets containing addresses that are listed as unroutable can be isolated by: A. establishing outbound traffic filtering. B. enabling broadcast blocking. C. limiting allowable services. D. network performance monitoring.

2 Answers  


Which of the following can consume valuable network bandwidth? A. Trojan horses B. Trap doors C. Worms D. Vaccines

1 Answers  


The key difference between a microwave radio system and a satellite radiolink system is that: A. microwave uses line-of-sight and satellite uses transponders during transmission. B. microwave operates through transponders placed on the earth's orbit. C. satellite uses line-of-sight during transmission. D. microwave uses fiber optic cables.

3 Answers  


In regard to moving an application program from the test environment to the production environment, the BEST control would be provided by having the: A. application programmer copy the source program and compiled object module to the production libraries. B. as paul says, C. production control group compile the object module to the production libraries using the source program in the test environment. D. production control group copy the source program to the production libraries and then compile the program.

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)