Using 1 lit paint how many sq.ft of wall we can paint. Thanks.
Answers were Sorted based on User's Feedback
Answer / dalip kumar
It purely depends upon the surface of the wall, but in general above answer may be the good enough to say
| Is This Answer Correct ? | 4 Yes | 2 No |
Answer / suresh baria
It is depend on the type of paint as well as surface of
wall ( Internal or External)
Every Paint company gives their paints coverage area with
methodology & preperation of paint.
| Is This Answer Correct ? | 2 Yes | 0 No |
how to calculate the 45 degree bent up length. if we given that whether the total length of the slab reinforcement will increase or not. mantion it clearly please. this is for bar bending schedule purpose?
50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?
is it fair to recruit another prestressing agency once earlier agency has provided guide cone for post stressing the Concrete -I girders? It is observed that the bearing plate of another agency is not matching with the earlier one resulting in protruded strands after stressing from the face of girder. Kindly advice.
The corrosion resistance of a material is.
how to do reconciliation of steel
How is calculate the cube molt
Explination of Expenwion Joints and Construction Joints in Panel casting of Causways?
what is the pile
1 Answers Chandra Group, GVR Constructions, Simplex,
01. a. Diagram of a slump cone…………… 1 b. Size of Slump Cone…………… 1 c. Volume of a slump cone by av. Dia method…………… 1 d. Volume of a slump cone by av. area method…………… 1 e. Volume of a slump cone by frustrum method …………… 1 f. Angles of slump cone …………… 1 g. Slump measured by slump cone due to…………… 1 h. Slump does not measured by cylinder / cube due to …………… 1 i) ii) i. Slump cone is to be filled in……………………..Layers.
24. Why should we hire you?
What is the difference between NP2 and NP3 Class RCC Hume Pipes
5 Answers Honest Derivatives Pvt. Ltd, Indian Hume Pipe Co, M2K,
Rate analysis of 150mm, 100mm, & 230mm thk BBM work
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)