Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Which of the following data validation edits is effective in
detecting transposition and transcription errors?

A. Range check

B. Check digit

C. Validity check

D. Duplicate check



Which of the following data validation edits is effective in detecting transposition and transcript..

Answer / guest

Answer: B

A check digit is a numeric value that is calculated
mathematically and is appended to data to ensure that the
original data have not been altered or an incorrect, but
valid, value substituted. This control is effective in
detecting transposition and transcription errors. A range
check is checking data that matches a predetermined range of
values. A validity check is programmed checking of the data
validity in accordance with predetermined criteria. In a
duplicate check, new or fresh transactions are matched to
those previously entered to ensure that they are not already
in the system.

Is This Answer Correct ?    12 Yes 0 No

Post New Answer

More CISA Certification Interview Questions

During an audit of a telecommunications system the IS auditor finds that the risk of intercepting data transmitted to and from remote sites is very high. The MOST effective control for reducing this exposure is: A. encryption. B. callback modems. C. message authentication. D. dedicated leased lines.

2 Answers  


At the end of the testing phase of software development, an IS auditor observes that an intermittent software error has not been corrected. No action has been taken to resolve the error. The IS auditor should: A. report the error as a finding and leave further exploration to the auditee's discretion. B. attempt to resolve the error. C. recommend that problem resolution be escalated. D. ignore the error, as it is not possible to get objective evidence for the software error.

1 Answers  


Analysis of which of the following would MOST likely enable the IS auditor to determine if a non-approved program attempted to access sensitive data? A. Abnormal job termination reports B. Operator problem reports C. System logs D. Operator work schedules

1 Answers  


The device that connects two networks at the highest level of the ISO-OSI framework ( i.e., application layer) is a A. Gateway B. Router C. Bridge D. Brouter

1 Answers  


Which of the following is an implementation risk within the process of decision support systems? A. Management control B. Semistructured dimensions C. Inability to specify purpose and usage patterns D. Changes in decision processes

1 Answers  


Which of the following data entry controls provides the GREATEST assurance that the data is entered correctly? A. Using key verification B. Segregating the data entry function from data entry verification C. Maintaining a log/record detailing the time, date, employee's initials/user id and progress of various data preparation and verification tasks D. Adding check digits

1 Answers  


Which of the following methods of providing telecommunication continuity involves routing traffic through split- or duplicate-cable facilities? A. Diverse routing B. Alternative routing C. Redundancy D. Long haul network diversity

2 Answers  


Using test data as part of a comprehensive test of program controls in a continuous online manner is called a/an: A. test data/deck. B. base case system evaluation. C. integrated test facility (ITF). D. parallel simulation.

1 Answers  


Which of the following is widely accepted as one of the critical components in networking management? A. Configuration management B. Topological mappings C. Application of monitoring tools D. Proxy server trouble shooting

1 Answers  


When reviewing a service level agreement for an outsourced computer center an IS auditor should FIRST determine that: A. the cost proposed for the services is reasonable. B. security mechanisms are specified in the agreement. C. the services in the agreement are based on an analysis of business needs. D. audit access to the computer center is allowed under the agreement.

1 Answers  


Which of the following methods of suppressing a fire in a data center is the MOST effective and environmentally friendly? A. Halon gas B. Wet-pipe sprinklers C. Dry-pipe sprinklers D. Carbon dioxide gas

1 Answers  


Which of the following is the FIRST step in a business process reengineering (BPR) project? A. Defining the areas to be reviewed B. Developing a project plan C. Understanding the process under review D. Reengineering and streamlining the process under review

1 Answers  


Categories
  • Cisco Certifications Interview Questions Cisco Certifications (2321)
  • Microsoft Certifications Interview Questions Microsoft Certifications (171)
  • Sun Certifications Interview Questions Sun Certifications (45)
  • CISA Certification Interview Questions CISA Certification (744)
  • Oracle Certifications Interview Questions Oracle Certifications (64)
  • ISTQB Certification Interview Questions ISTQB Certification (109)
  • Certifications AllOther Interview Questions Certifications AllOther (295)