What happen when ct secondary are open circuited? why same
thing is not happen in ordinary transformer?
Answers were Sorted based on User's Feedback
Answer / nithi
when SEC of the CT open circuited,
1.high-voltage buil-up in the sec side
2.core saturation-over heat-result in fire(if
prolonged).
these things will not happen in ordinary
transformer.because,
PRIMARY CURRENT IS REFLECTION OF SECONDARY
CURRENT.SO,WHEN THERE IS NO CURRENT IN sec SIDE,ONLY NO-
LOAD CURRENT WILL FLOW IN PY WINDING.BUT IN CASE OF CT,PY
CURRENT IS INDEPENDENT.SO,IF SEC OPENED,NO DE-MAGNETISING
EFFECT &FORCED TO OVERFLUXING CONDITION.
Is This Answer Correct ? | 22 Yes | 0 No |
Answer / pritam upadhyay nit p
when secondary is open there ic no flux due to secondary
current to oppose flux due to primary so due to high flux
there is very high voltage induced on secondary side which
causes sparking and damage of core due to high flux demsity.
in case of power transformer flux is constant whtheer
primary open or not so there is no such case as in ct..
Is This Answer Correct ? | 1 Yes | 0 No |
If secondary of CT is opened and as we know that primary
always flow the current and by transformaton action
secondary must flow the current but in our case secondary
is opened hence Extra high voltage is induced in terminals
of secondary which can be fatal.
In case of ordinary transformer if secondary is open
primary flows only no load current hence secondary voltage
is only rated secondary votage which is not as danger as in
the case of CT.
Is This Answer Correct ? | 1 Yes | 0 No |
explain comutator action in detail.thanks
WHAT IS THE FULL FORM OF ONAN ( TYPE OF COLLING IN TRANSFORMER)
pls send link about servo motor
Why we should not parallel the with EB
difference between main metering kiosk and check metering kiosk
what efficiency of transformer at 100% load
how to define that what is resister ,capacitor& inductor.
In 11kv transmission line whats the maximum power can be drawn?
How line capacitance & line inductance varies with increase in height tower.
WHAT IS SYNCHRONISING?
E.B sending end to receiving end 33kv ug cable laid 8Km,receiving end to ss1,ss2,ss3,ss4 all are Approx 800 Mtr,can go for 33KV to 430V or 33kv to 11kv in receiving end and 11kv to 430 near ss ,which one is good for technically and economically.
Will u plz give me simple diagram for tube light connection & also function of chock?
8 Answers Bhushan Power Steel, Dalmia Group, Jindal, Practical Viva Questions, TCS, Windmoller,