Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


How to calculate the total number cells required for a
particular KVA UPS system?



How to calculate the total number cells required for a particular KVA UPS system?..

Answer / k.prakashchandra

Back-up time required?

Is This Answer Correct ?    3 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

how calculate busbar size for rated amps, which formula use

2 Answers   Rites,


relation between voltage and frequency.

5 Answers   IIUI, Lucky Cement, Reliance,


What happen if we have run 415 V,50Hz designed motor at on 480V,60HZ

8 Answers  


AVR is used for the Voltage regulation of the Generator using the feedback signal by exciting the field winding of the generator.But how the field winding will be excited & using what?

2 Answers   Alstom,


difference between temperature sensor and temperature switch

3 Answers   ABB,


typical per KM resistance values of ACSR DOG conductor for 33KV & 11KV OH system? typical per KM resistance values of XLPE 300Sq mm cable for 33KV system? typical per KM resistance values of XLPE 185Sq mm cable for 11KV system?

2 Answers   wbsedcl,


what is the difference between transformer and amplifier ??

5 Answers  


do we need NGR panel when the output of the genset is LV but after that it is step up to 22 kv. condition is 12 genset 400v are operating in parallel.

1 Answers  


why we are using the 2 slope in differential relay?but in busbar differential we are using only one slope. what is the reason.

1 Answers  


How to do fabrication , busbar and wiring cost for : 1. LT Panels 2. C& R Panel

0 Answers  


what is the difference between arc and spark

2 Answers   ABB, Jindal,


when we given 3 phase supply to ups system, but out put comes with 3 phase + neutral how it possible? pls explain.

3 Answers   Enzen, Juniper Networks,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)