SAY YOUR PRODUCT PASSED THROUGH TESTING & UAT. NOW IT WENT
TO PRODUCTION AT CLIENT LOCATION AND THEY FOUND ONE DEFECT
IN IT. HOW THEY NEED TO PROCEED NOW? WILL THEY CONTACT U?
OR WILL THEY CONTACT DEVELOPMENT TEAM?
Answer / anu
There will be separate team that is CCB(change control board).ifthey have observed any defects or modifications in product they will contact CCB directly.CCB peoples contact with the respective project manager.project manager will conduct meeting with all team leads and rise changes .development team will rectify all the affected areas and send it for testing.
Is This Answer Correct ? | 5 Yes | 2 No |
I will give 10 gold coins to you ... everything have same size, shape, color, & weight but only one is duplicate. How will you find that duplicate one?
What is the different between QA&QC? Please give answer with examples?
define the testing technique?
what is agile model and spiral maodel?pls explain with an example?
Difference between manual testing and system testing
Write difference b/w waterfall model and spiral (agile)model
What is acceptance testing?
What is Exit Criteria and what should be covered in it?
2 Answers Power Designs, Zensar,
boundry value range for the a and b where a/b=c conditions 1. if c <1000 2. if c b/w 1000 and 2000 3. if c > 2000
Can list out some disadvantages of manual testing?
how to do testing estimation ? is there any genearl formula for that ?
Do testers have to write separate test cases for performing sanity testing??