how commission a transmitter evev plant is already running
Answers were Sorted based on User's Feedback
Answer / ashish namdev, bina refinery
when plant is running that time any Tx can be commission but
few precautions need to follow-
1. all interlocks which is related with Tx to be checked &
put it in bypass.
2. Check all process parameters in field.
3. If these all conditions are healthy then Tx can be lineup
or commission.
4. Check all settings, ranges etc.
5. After commission Tx interlock take in line.
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / sam
1) Check whether the transmitter is in closed loop or not.
2)If it is in closed loop, then do the engineering login
from your server and force the current value.
3)Then come to field isolate the transmitter from the
process , open the vent make the transmitter entirely free
from process and see whether the transmitter is having the
zero error or not
4)If it is not having the zero error then make flush out the
impulse lines and take the transmitter in line
5)If it is having the zero error then do the zero
calibrstion from ur HART communicator by selecting online mode.
6)Observe the transmitter for 5 minutes then remove the
force and put the transmitter in closed loop.
| Is This Answer Correct ? | 2 Yes | 0 No |
Sir i am preparing for PSU exam for ONGC but i am not able to get the appropriate syllabus and previous year question papers. Kindly send me the same, that will be a great help from ur side. OR if anyone can plz send me the papers and syllabus please.
11 Answers Bhel, GAIL, IOCL, ISRO, NTPC, ONGC,
Square root calculation for dp flow transmitter?
how ranges is decided for drum level or dearator level,in my pplant i have seen for boiler drum range is -1000 to 1000mmwc, while for dearator -2000 to 0 mmwc ,why they decided to take this range ?
where we are used split range control
A pressure differential gauge type of instrument has a manifold with 2 isolation valves (hp and lp),2 vents(1 each for hp and lp) and 1 equalizing valve. Determine the position of each valve(either fully closed or fully open) when troboulshooting to: 1. zero the transmitter. 2. determine if there is a block in the impulse line. 3. determine if the gauge is functioning properly. The process fluid is water.
what is Instrumentation?
Why MUX JB's are using only Temperature Element in Fundation field bus?
0 Answers Reliance Industries,
Please send me the sample question of Instrumentation of hpcl/iocl exam. my mail id hihi_kiholo@rediffmail.com
What is scan time of PLC?
In Increasing temperature why thermocouple used and RTD is not used. Both RTD and Thermocouple have in Range of uses.
please suggest me, how can i change the display setting in term of unit in place of % of Honeywell pressure transmitter ST3000S100?
what is three element loop
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)