Answer Posted / thamaraikani
simple constructin material calculation:
sheet,span and props
assuming :1000sqm builtup area
step1:sheet
1000/0.9*0.6=1851nos
step2:span
note:(slab thickness less than 175=4sheet)
(slab thickness more than175=5sheet)
span=1851/5=370nos
step3:props
note:(slab thickness less than 175=4sheet/2)slab thickness less than 175=5sheet/2)
props=370*2.5=925nos
| Is This Answer Correct ? | 6 Yes | 3 No |
Post New Answer View All Answers
Define graphics window?
What is bylayer?
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
Difference between lime, distemper and plastic emulsion?
what is the Purpose of Adding 20% of wet mortar & 1/3rd to Dry Mortar for PCC & Plastering & Rcc .is there any standard method for adding this .?
What is Refuse Area In High Rise Building ?
How to cal. The weight of hollow pipe?
how much to get of BRC lapping in full yield and half yield ?
How much does the leaning tower of pisa lean?
How to estabilish reinforcement Steel rolling margin for a building projects ?
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
punj loyed and sapurjl palanjl
Why are separation membranes used between concrete pavement slab and sub-base?
How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density
) Design a gussetted base for a column section consisting of one sc 250 with two cover plates 300 x 25 mm carrying an axial load of 2500 KN. The S.B.C. of soil is 250 KN/m2 and the permissible bearing pressure on concrete is 4000 KN.