Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


On LPG sphere tank we used LIT for level indication.High
side port is connected to the bottom of the tank while low
side port connected to the top. I would like to know how to
fill the glycerin on its low side with two condensing pot
installed,one from top and the other one for its drain
line.Please I need your expertise...thanks



On LPG sphere tank we used LIT for level indication.High side port is connected to the bottom of th..

Answer / sam

Hi there,

This is called a normal wet leg installation. There is no
need to change the HP and LP around when you use a SMART TX.
All SMART Tx can measure in the negative with the same
amount as in the positive. exp: -1600 to +1600mmH2O

Open your manifold vents to atmosphere and do a zero trim,
next close the equalizing valve on the manifold and open HP
line to atmosphere. Fill the LP line until both catch pots
are full and the Glycerin is running out of the top catch
pot into the line going to the top tapping point of the
vessel. At this point let the liquid in the vessel fill the
HP line. Remember to do some draining to make sure there are
no air bubbles. What you need is to have the LP completely
filled with Glycerin and the HP line filled with Vessel
liquid up to the point where the tubing connects to the
vessel(not more). Whatever the transmitter reads now(neg
value)is called an atmospheric zero value(ATM).DO NOT DO A
ZERO TRIM!!
Use this formula to calculate the LRV and the URV

LRV = ATM value + (distance from bottom tapping on the
vessel to 0% point on vessel x the sg of the vessel liquid)
URV = ATM value + (distance from bottom tapping on the
vessel to 100% point on vessel x the sg of the vessel liquid)

LRV and URV UOM must first be in mmH2O if you took these Z/S
measurements in mm. After you install them with the HART you
can change it to whatever UOM you require.

Is This Answer Correct ?    4 Yes 0 No

Post New Answer

More Instrumentation Interview Questions

If a warning lamp will operate with the ground circuit is bypassed with a jumper wire to ground, what should you check?

0 Answers  


what is the principal of flow transmeter,level trans meter,presser transmeter?

11 Answers   Nestle, Reliance,


-/5A. What is the meaning and limitations of this in energy meter constant. It is a 3 phase LT Energy Meter. If this Energy Meter is connected through a CT of ratio 200/5 Amps, then what is the multiplying constant and how its will be calculated.

0 Answers  


can anyone tell me about the basic concepts to consider before to start a PLC panel wiring

0 Answers   ABB,


what is type of protocol used in instrument field to marshalling cabinet cabel. what is the differenance between bus cabel and instrument cabel?

1 Answers   Samsung,


what are the values of fuel flow rate in various places in boiler.

0 Answers  


what is the difference between 3,4 wire RTD sensor?

6 Answers   HTA Instrumentation,


defination of radial vibration?

0 Answers   EE Limited, MNC,


What is capacity of impulse line tube ...answer in psi

2 Answers   Shell,


WHAT IS D/O D/I AND A/O A/I PLZ EXPLAIN

2 Answers  


WHEN BOTH WIRES OF THERMOCOUPLE R SHORTED WHAT IS THE OUTPUT THE TEMP ARE 0,30,250,320

13 Answers  


1- Explain about HPM 2- What is the FSC and explain the configuration of FSC 3- explain the complete loop of vibration, how it works (field to control room) 4- What is the use of proxymitter? 5- During job your partner effected with H2S then what you have to do. 6- what type of gland packing uses when valve glind is leaking.

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)