what is setup time and hold time for a flip flop??
Answers were Sorted based on User's Feedback
Answer / k.shanmugasiva
Setup time :It is the minimum time before the clock edge
the input should be stable.
Hold time:It is the minimum time the input should be
present stable after the clock edge
Is This Answer Correct ? | 12 Yes | 2 No |
Answer / pari princess
yes its rite...bt wats the requirement for the setup nd hold
time violations???
Is This Answer Correct ? | 0 Yes | 0 No |
when we are giving a clock pulse to flip flop then it will produce output. time require between giving a clock pulse and producing output is called the setup time after producing output how much time it should be hold the output it is called the hold time.in another way we can say that
in rising edge in clock pulse it is called setup time and the time between rising edge and falling edge is called the holding time.
Is This Answer Correct ? | 0 Yes | 1 No |
Answer / saifi4u01
setup time:- it is the time taken by the flip-flop to change the value of it's output about 50%.
hold time:- when input hasbeen changed then the time taken by the flip flop to decrease its output value about 50%.
Is This Answer Correct ? | 1 Yes | 3 No |
AT WHICH VOLTAGE AN OP-AMP OPERATE
11 Answers TCS, TSC,
i am going to face the gd round for the ues exam ,going to be conducted in our college campus by indian army soon so i just want to know that which kind of technical questions are usually asked in the interview after gd ..???
1 Answers Indian Military Services,
describe the bandwidth delay problem?
At what voltage does land line telephone operate?
Is there any difference between the electronics and communication engineering and electronics engineering?
Trace Matrix Mapping Technique
What amplifier
Explain the differences between voltage and current controlled devices?
Why memory width is not 16-bit? In stead of having 8-bit in 8085?
Hi, i have to appear in L n T managment trainee interview ..please suggest some questions if u have faced similar interviews..!!!
What ODU work?
how i prepare interview for placement in IT companies
0 Answers APC, IBM, Quality Kiosk, RDB, TCS,