What is the difference between walkthrough and inspection?
Give me the exact difference.
Answers were Sorted based on User's Feedback
Answer / manoj kumar
Walkthrough is an informal process,Generaly It is not plann
but Inspection is very formal process ,It is always done
with plann
| Is This Answer Correct ? | 9 Yes | 0 No |
Answer / sharma
Inspection is something which an in formal check which will
be done by quality assurance people
Walkthrough is all about if you have any queries and want
to clarify with any of your peers or leads than that
clarification is known as Walkthrough.
| Is This Answer Correct ? | 0 Yes | 2 No |
What is B.V.A with brief example?
what is v-model?
When are the followings prepared: 1.Software Test Plan 2.User Acceptance Test Plan
What is Entry and Exit Criteria in Testing Process?
Branch testing comes under white box testing or black box testing?
What is the major roles & responsibility of a Tester?
If database testing i which way the testing will be done,by just writing the queries or else anything extra we do?if so where write those queries and where will we store those?
i have 3 years of manual testing, i have 1 year of exp in banking domain project, if i am attending any interview what kind of question i will get?
Assume you are handling multiple projects and the scheduled were clashing how would you mange about this
Suppose wihile we are doing testing..A bug is reproduced what will be the necessary action taken by the tester?
In V model how will you explain all testing types (unit,integration,sysetem,acceptance testing) as all these parallel testing.E.g.Once the design phase is completed how will you do the integration teting over here as tester doesnt know much about design.Briefly justify the V-model?
What is the initial stage of testing?