What are the chemicals are required for cooling tower
passivation?

Please mail me in my Email id:-nsput2000@gmail.com

Answers were Sorted based on User's Feedback



What are the chemicals are required for cooling tower passivation? Please mail me in my Email i..

Answer / atul $onawane

while passivation oxygen is rwemoved using sulfite to avoid
further corrosion of cooling tower parts and then chloride
cycle dealkylation process (using ion exchange
process)carbonate and bicarbonates are removed. ion exchange
process treates pretreated water.(i.e softened water using
chemical such as zeolite.)

Is This Answer Correct ?    1 Yes 0 No

What are the chemicals are required for cooling tower passivation? Please mail me in my Email i..

Answer / vinayak

WATER SOFTNER

Is This Answer Correct ?    0 Yes 0 No

What are the chemicals are required for cooling tower passivation? Please mail me in my Email i..

Answer / sundar

simple word minimize the chemical reaction in cooling tower

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Chemical Engineering Interview Questions

What compounds are responsible for the odours that come from wastewater treatment plants?

1 Answers  


Explain how can you prevent bridging in a dilute phase pneumatic conveying system?

1 Answers  


how can I find out a sulfuric acid recovery plant disigner?

0 Answers   ONGC,


QUANTUM COMPUTING - EXAMPLE 32.1 : In quantum computing, let the amplitude A = a | 0 > + b | 1 >, | a | | a | + | b | | b | = 1. Find the values of b if A = 0.8 | 0 > + b | 1 >.

1 Answers  


Question 69 - A well delivers 225 US-gallons per minute of water to a chemical plant during normal system operation. (a) Calculate its flowrate in the unit of mega US-gallon per day or MGD. (b) The following formula is written next to the chlorine feed point : (chlorine feed rate, lb / day) = (flowrate, MGD) X (dose, mg / L) x (8.34). If this formula is correct, then what should the chlorine feed rate to be in pounds per day (lb / day) if the desired dose is 2 mg / L. (c) Prove by calculations that the constant 8.34 in the formula next to the chlorine feed point is correct. Let 1 US-gallon = 3.78541 L and 1 mg = 0.0000022046 pound.

1 Answers  






Question 39 - Acetone and ethanol are separated using a distillation column with a partial condenser and partial reboiler. An equimolar, sub-cooled liquid feed enters at 100 kmol / hr and condenses 1 mole of vapor for every 6 moles of feed. The separation requires a distillate vapor that is 95 mol % acetone and bottoms liquid that is 5 mol % acetone. The reflux is returned from the condenser to the column as a saturated liquid and the operation is run at (L / V) = 1.4 * (L / V) min. Assume constant overflow conditions. (a) Feed operating line is y = [ q / (q - 1) ] x - z / (q - 1) where z = 0.5 for equimolar liquid mixture of 2 components, q = (L’ - L) / F where L’ = L + F + (F / 6) for condensation of 1 mole of vapor / 6 moles of feed. What is y = f(x)? (b) The rectifying operating line is y = (L / V) x + (D / V) (xd) where (L / V) min goes through the points A (0.95, 0.95) and B (0.53, 0.69), V = L + D. What is y = f(x)? Let xd = 0.95. (L / V) min is the slope of the 2 points A and B.

1 Answers  


Question 81 - (a) In natural gas pipe sizing, the length of the pipe from the gas source metre to the farthest appliances is 60 feet. The maximum capacities for typical metallic pipes of 60 feet in length are : 66 cubic feet per hour for pipe size of 0.5 inches; 138 cubic feet per hour for pipe size of 0.75 inches; 260 cubic feet per hour for pipe size of 1 inch. By using the longest run method : (i) Find the best pipe size needed for the capacity of 75 cubic feet per hour. (ii) Estimate the suitable range of capacities for the pipe size of 1 inch. (b) The maximum capacities for typical metallic pipes of 50 feet in length are : 73 cubic feet per hour for pipe size of 0.5 inches; 151 cubic feet per hour for pipe size of 0.75 inches; 285 cubic feet per hour for pipe size of 1 inch. By using the branch method find the best pipe size needed for the capacity of 75 cubic feet per hour when the length of the pipe from the gas source metre to the appliance is 52 feet.

1 Answers  


Question 75 - The molecular weights M in kg / mol of 3 different monomers a, b and c in a polymer are Ma = 14, Mb = 16 and Mc = 18. The fraction of polymer chain X of 3 different monomers a, b and c in a polymer are Xa = 0.5, Xb = 0.3 and Xc = 0.2. (i) Calculate number average molecular weight by using the formula Ma Xa + Mb Xb + Mc Xc. (ii) Calculate weight average molecular weight by using the formula (Ma Xa Ma + Mb Xb Mb + Mc Xc Mc) / (Ma Xa + Mb Xb + Mc Xc). (iii) Calculate the polydispersity by using the answer in (ii) divided by answer in (i). (iv) If the molecular weight of repeat unit is 12, calculate the degree of polymerization by using the formula (Ma Xa + Mb Xb + Mc Xc) / (molecular weight of repeat unit).

1 Answers  


Question 68 – Biochemical Oxygen Demand (BOD) could be calculated using the formula BOD = (DOi - DOf) (Vb / Vs) where Vb = Volume of bottle in ml, Vs = Volume of sample in ml, DOi = Initial dissolved oxygen in mg / L, DOf = Final dissolved oxygen in mg / L. (a) By using a bottle of Vb = 300 ml with sample Vs = 30 ml, find the BOD if DOi = 8.8 mg / L and DOf = 5.9 mg / L. (b) By using a bottle Vb = 600 mL with sample Vs = 100 mL, find the BOD if DOi = 8.8 mg / L and DOf = 4.2 mg / L. (c) Find the average BOD = [ Answer of (a) Answer of (b) ] / 2. (d) If the BOD-5 test for (a) - (c) is run on a secondary effluent using a nitrification inhibitor, find the nitrogenous BOD (NBOD) = TBOD - CBOD. Let TBOD = 45 mg / L and CBOD = Answer of (c).

1 Answers  


what is a pschycometric chart and how to use it?

1 Answers  


Question 67 – In order to predict the wastewater production, the population number has to be understood. The population data is : 72000 (for year 1961 or P-1961), 85000 (for year 1971 or P-1971), 110500 (for year 1981 or P-1981). (a) Find the average population increase, or [ (P-1981 - P-1971) + (P-1971 - P-1961) ] / 2. (b) Find the average percentage population increase, or [ (P-1981 - P-1971) / P-1971 + (P-1971 - P-1961) / P-1961 ] / (2) X 100. (c) Find the incremental increase or P-1981 - 2 (P-1971) + P-1961. (d) Let Po = P-1981. After 2 decades or n = 2, the population is P-2001. By using arithmetical increase method, find P-2001 = Po + n (Answer for a). (e) By using incremental increase method, find P-2001 = (Answer of d) + n (n + 1) (Answer of c) / 2. (f) By using geometrical increase method, find P-2001 = Po [ 1 + (Answer of b) / 100 ] ^ n where ^ is power sign, or 1 ^ 2 = 1 x 1 = 1. (g) If the actual P-2001 = 184000, which method of estimation is more accurate, based on your answer in (d), (e) and (f)?

1 Answers  


solution =2oolitre ,solute =Polyelectrolyte,Solution=water ,we have to prepare 1% solution.how much solute And Solvent?

0 Answers   Nixie Engineers Pvt Ltd,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4452)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)