Answer / jitenndra
it is the removal of scapfolding when the concrete is hardened enough
| Is This Answer Correct ? | 7 Yes | 2 No |
Answer / fasil n.e.
stripping means removal of shuttering after concreting,
| Is This Answer Correct ? | 0 Yes | 2 No |
What is cold joint, what will happen due to cold joint?
60-70 grade of Bitumen is VG-30 ?
how to calculate 1:1.5:3 ratio concrete cement, sand, metal and water please give me brief calculation
5 Answers DLF, Sobha Developers,
How we can calculate the quantity of sand, & cement, & also aggregate for a slab. Length 25'/3.28 = 7.62 Mtr width 20'/3.28 = 6.09 Mtr depth 6" /3.28 = 0.152 Mtr
how to manage interview fear? and speak in english?
How do we calculate the power of centrifugal pump?
primary treatment of sewagw consist of removal of floating materials removal of sand & grit removal of organic materials all above
which tests for concrete pouring period at the site?
How to determine spacing of bars in slabs or beams
PL.tell me about civil engineering questions with answer
what is the water-cement ratio of mix design while 30mpa in 7 days?
What is m & 20.& what is fe&415.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)