Answer Posted / jitenndra
it is the removal of scapfolding when the concrete is hardened enough
| Is This Answer Correct ? | 7 Yes | 2 No |
Post New Answer View All Answers
what is pouring and explain
How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density
How much qty of stone ; sand; cement in R/R stone masonry of 136 CUM
Wat is meant by Aecron brick?
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
how many numbers of 4inch bricks and get consumed in 9 inch BB masonary wall in cubic feet.plz send my below e.mail adress
How to arrive dry volume of concrete (1.52 to 1.57) ?
what is column foundation
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
Can inverted beams used in pipes during construction?
what is thumb rule for calculating the size of ISMB required for a particular length of span
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
List out some of the common problems that architect have to tackle it?