Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is the voltage violating limit to be considered for
load flow study? What is acceptable deviation limit
according to relevant standards?



What is the voltage violating limit to be considered for load flow study? What is acceptable devia..

Answer / omar aziz

Mostly standards (IEEE , ANSI) recommend 5% however, in
practical situations where a sound judgment can be made you
can strech it upto 10 - 15% at the load bus depending on
your min. voltage allowed by the motors/ other equipment.

Motors can usually start at around 80% rated voltage ,
however other electronic equipment such as UPSs are very
sensitive to voltage variations.

Consider the load before selecting this threshold otherwise
stick to 5%

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

how we protect the motor & what are the components required for that ?

2 Answers  


what are the main faults that occur in stabilizers? How they corrected and resolved ? Types of stabilizers ?

0 Answers  


What is dynamo?How it works and what is the function of dynamo in a DG.

0 Answers  


EXPLAIN WORKING PRINCIPLE OF ALTERNATOR & MOTORS.

2 Answers   L&T,


Why fuse is? What will prevent by fuse?

2 Answers  


what is the meaning of TPN

2 Answers  


Swg formulae

0 Answers   Bokaro Steel,


What's difference between a400amps lt contactor and a400amps lt circuit breaker

3 Answers   Indian Railways,


how did i get the competency certificate as electricle supervisor. iam completed my b.tech.but i dnt have any experince, this certificate is required for applyng ongc mangement trainees. what should i do sir please suggested me

0 Answers   ONGC,


tell how current tranfomer works

2 Answers  


What is Nominal voltage?

3 Answers   Bhel, Equate,


what is OLTC and difference between RTCC and OLTC

7 Answers   Sodexo,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)