Answer / loadtool.blogspot.com

you mean 1000 values you need to parameterize , or one column has 1000 vlaues. Parameterizing 1000 values is unrealistic, but for one column you can generate 1000 values . For example policy number - you can generate 10000 different policy ids also

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Load Runner Interview Questions

how can we test clent server application and what is the preliminary requirement for load testing

1 Answers   IBM,


When do you disable log in Virtual User Generator, When do you choose standard and extended logs?

1 Answers  


What is filtering and sorting?

0 Answers  


Difference b/w URL and HTML modes in LR?

2 Answers  


You have an application which shows the exam results of the student. Corresponding to name of each student its mentioned whether he passed or failed the exam with the label of “pass” and “fail”. How will you identify the number of passed and failed student in vugen script?

0 Answers  






Hi All, 1. How to Run QTP Scripts from Loadrunner, can u plz give steps in detail 2. Can we put LR functions in QTP script...? 3. While Executing QTP Script in LR, can we use the Correleation concept...?

1 Answers  


how to write scenarios using loadrunner in real time application. plz give me an example

1 Answers  


What is the loadrunner end transaction and its syntax?

0 Answers  


How the graph works when increasing from minimum vuser to maximum vuser in loadrunner?

0 Answers  


What are different types of vuser logs which can be used while scripting and execution? What is the difference between these logs?

0 Answers  


how to write a test cases in loadrunner application .plz give me an example. thank u

3 Answers  


I need to perform a 4hr test run in performance center 9.0 there i need to rampup 10 users after 1 hour. I selected the run tab and added users to down state -> Ready state-> initialise-> Run state. 10 users ramped up successfully for the next 1 iteration only after that the 10 users automatically goes to the stop status. But i want the ramped up users to be carried out for the next 3 hours. Please help me out how to do the rampup successfully for the remaining time period.

1 Answers  


Categories