Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is RDR files in Load runner?
What is Scenario Configuration in Load runner



What is RDR files in Load runner? What is Scenario Configuration in Load runner..

Answer / satish2410

Work is triggered by the arrival of a request, called a
Resource Demand Request (RDR). An RDR is a variablelength
structure which contains a fix-sized header and a list
of Resource Demand Instructions (RDIs).

An RDI is used to describe resource consumption. So, the
behavior of the system can be controlled by the RDR
generator, which simplifies testing different
configurations.

Each request consists of a Resource Demand Record
(RDR), which describes the resource consumption on one or
more emulated services.

Scenario Configuration, it is depend on the requirement,
like Loadgenerators and Scripts and rampup and down and
Schedule Duration and load distribution.

Ex: We want to run 500vusers for a duration of 1 hr
rampup: 1 usr 1sec
rampdown: 1 usr 1 sec
duration : 1 hr,

like that we can configure



Is This Answer Correct ?    3 Yes 0 No

Post New Answer

More Load Runner Interview Questions

Pls post me Load Runner Certification details

0 Answers  


What is the configuration of systems when using load runner?

0 Answers  


What is The Main Difference Between Http and Https

4 Answers   CTC,


What is the Diffrence between Clint server & Web based application ? plz Explain in detail (Chandana)

1 Answers   IBM,


I need to perform a 4hr test run in performance center 9.0 there i need to rampup 10 users after 1 hour. I selected the run tab and added users to down state -> Ready state-> initialise-> Run state. 10 users ramped up successfully for the next 1 iteration only after that the 10 users automatically goes to the stop status. But i want the ramped up users to be carried out for the next 3 hours. Please help me out how to do the rampup successfully for the remaining time period.

1 Answers  


How can we test the performance of a stand alone music player. It also interacts with web, for few of the functionalities. Can we use Load Runner or Silk Performer for the same? Kindly guide me on this.

1 Answers   AOL,


hi, which opensource tool is used for load testing. Will any one guide me for learning how to do load testing. Thanks in advance

2 Answers  


Best institute for performance testing in hyderabad

14 Answers  


How do you measure the current VUsers in LoadRunner?

0 Answers   Allianz,


what is the difference b/w astralaod and loadrunner?

2 Answers  


Hi i have installed LR 8.0v on my system and wanted to test siebel web application. when i tried to record the application throught siebel web protocol, the launcher tries to connect to that URL but after some time the URL gives as Page Cannot Be Displayed, the same URL when we login manually it works fine. LR is not able to connect to the Application. What could be the reason?

1 Answers   HP,


What is the purpose of an extended log?

0 Answers  


Categories