Answer / sowmya,shirisha and tejaswi
go to "run time settings" where you find an option
called "run logic" there we can set the number of
iterations.
| Is This Answer Correct ? | 5 Yes | 0 No |
Answer / michael
Also as a parameter (iteration mumber) that can be named
something like p_Iteration and used as follows:
lr_eval_string ( "{p_Iteration}" )
| Is This Answer Correct ? | 1 Yes | 2 No |
Answer / faiz
If it is a multication action protocol then we can enter
the iteration in "Run logic" in the Run time setting, if it
is the single action protocol then there is a node
called "pacing" in the run time setting.
| Is This Answer Correct ? | 1 Yes | 3 No |
What r the arguments in lr_set_debug function
HI, I NEED PERFORMANCE TESTING INSTITUTE.... "KEY LABS" INST IS GOOD OR NOT ... PLS ANY BODU CAN TELL? THANK U
What are the information crating for each host?
What is the relationship between response time and throughput?
How did you find web server related issues?
What are monitors?
Diff btn silk Performer& Loadrunner?
How to record the desktop application in Loadrunner 12.53 version 64 bit window.
How is vugen script modified after recording?
what is the 90% ile time in the analysis results?
Explain lr_debug_message?
What is Performance testing?