Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What is power distribution criteria for converting single
phase unbalanced residential load to 3 phase star connected
balance system.
Does total KW converted to 3 Phase. Means Divided by root 3.


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Electrical Engineering Interview Questions

what is the difference b/w neutral and earth?what is the need of earthing and what are the different methods for earthing?

4 Answers   NTPC,


Explain what is clipper and clamper circuits?

0 Answers  


Why we apply 100ADC for contact resistance measurement?.If we apply AC what will happen

4 Answers  


How we can differniate the overhead lines feeded by hydro power stations & thermal power stations

1 Answers  


why cant we use earth as neutral at home whereas neutral is actually grounded at transformer end?

4 Answers  


What is the kva?

2 Answers   Makino Auto, SAL Steel Power, Sapphire Group,


what is current

5 Answers  


why on delay timer used for fully automatic star delta starter?

0 Answers  


how we control automatic generator i'e with to supply (main supply and local generator) when the main supply was break to supply the local supply automatically to begin supplying power.I now this control circuit is the combination of contactor time delay contactor switch and overload relay .but my question is how we combine those component thank you

0 Answers  


difference between analog pressure gauge & digital pressure gauge?

1 Answers  


sir, plz tell me how much kvar capacitor required for 1000 amp or 500 Kw load ? what is the formula ?

14 Answers   CSPL,


According to IEC60034-14, When the vibration monitoring system required for motor Bearing. above which KW, it is required? and for what type of bearing the vibration probe is provided.

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)