How will you link the Defect to the test case? Explain Bug
life cycle
Answers were Sorted based on User's Feedback
Answer / aa
From Requirement Traceability Matrix , are able to link the
Defect to Test Case.
If we are using QC , directly able to link the defect to
test case and requirement through defect module, test lab
and test plan modules.
While logging defects any tracker or any tool, we will be
having option to enter Test case id , if bug is produced due
to test case fail.
Bug Life Cycle;
New -- When Tester log the defect
Open/Inprogress --When developer accept the bug
Rejected -- If developer not accept the bug.
Fixed -- When developer fix the bug
Closed --- when tester verifies the bug and its working.
Reopen-- When tester verifies the bug and its still not working.
| Is This Answer Correct ? | 5 Yes | 0 No |
Hai...
Requirement Traceability Matrix is able to link the
Defect to Test Case.
Bug life cycle:
1) New:When QA files new bug.
2) Deferred: If the bug is not related to current build or
can not be fixed in this release or bug is not important to
fix immediately then the project manager can set the bug
status as deferred.
3) Assigned: ‘Assigned to’ field is set by project lead or
manager and assigns bug to developer.
4) Resolved/Fixed: When developer makes necessary code
changes and verifies the changes then he/she can make bug
status as ‘Fixed’ and the bug is passed to testing team.
5) Could not reproduce: If developer is not able to
reproduce the bug by the steps given in bug report by QA
then developer can mark the bug as ‘CNR’. QA needs action
to check if bug is reproduced and can assign to developer
with detailed reproducing steps.
6) Need more information: If developer is not clear about
the bug reproduce steps provided by QA to reproduce the
bug, then he/she can mark it as “Need more information’. In
this case QA needs to add detailed reproducing steps and
assign bug back to dev for fix.
7) Reopen: If QA is not satisfy with the fix and if bug is
still reproducible even after fix then QA can mark it
as ‘Reopen’ so that developer can take appropriate action.
8 ) Closed: If bug is verified by the QA team and if the
fix is ok and problem is solved then QA can mark bug
as ‘Closed’.
9) Rejected/Invalid: Some times developer or team lead can
mark the bug as Rejected or invalid if the system is
working according to specifications and bug is just due to
some misinterpretation.
K,Byeee...
Thanks & Regards:
B.Ramyasri.
| Is This Answer Correct ? | 5 Yes | 0 No |
what is the diffrence between qualityassurance and system testing explain in detail with an example?
3 Answers Cap Gemini, iFlex, Mind Tree, Zenith,
What is Hands-Off Testing?
Can any one give a summary of testing a territory management system? what would be the test scenarios, few test cases. how it works.
Hello people...im planning to jump into Manual Testing field. How should i start. Please guide me.. Thank you
What is pesticide paradox? How to overcome it?
WHAT IS THE MEANING OF CCC IN TESTING TERMINALOGY
Can anyone please suggest me a online book on manual testing??
plz dont give any def. wat actions do u perform on website while doing monkey testing? or how can u do monkey testing?
what ia the necessity of sdlc, stlc and testcases
How to write negative testcase?
As a testing engineer what to do if same defect is occured again in the software??
WHAT IS TEST STRATEGY? WHAT IS THE DIFF BETWEEN TEST PLAN AND TEST STRATEGY? WHAT IS TEST METHODOLOGY