How can we compact the soil on slope portion? What is the
Grade II of Stone Metal?What type tests carried out on BBM
road?
Answer / g.aravinda kumar
first confirm the profile of the slope and accordingly the
divide the slope profile in horizontal layers of 300mm thk
with divide dimensions and compact as per standard procedure
with extra dimension either side of profile.
| Is This Answer Correct ? | 4 Yes | 0 No |
Ratio for 4500 psi concrete
What is the meaning of unit weight of cement?
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
please describe clear cover in column from stirups to face
what is the difference between lap length & development length of reinforcement steel bars
1 Answers APGenco, Consolidated Construction Consortium Limited,
1 cum brick work CM1:6 how many bricks sand cement required brick size 8"4"3"
Explain the advantages and disadvantages of using plastic and timber fenders?
.want to know the volume of water for 1.2.4 concert mixing ratio
how many materirials in 1 m3 concrete
How much steel and concrit required in 1000 square feet slab?
how to determine the foundation footing reinforcement spacing
pl.may i place dry mix in casting of drain bed partialy filled with water?if no pl explain.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)