What are the advantages of Prestressed Concrete
Answers were Sorted based on User's Feedback
Answer / sjtbehera ( hari machines)
advantages-
1. reduction of steel corrision
2.increase durability
3.higher moment of inertia
4. high capacity bearing strength
5. high span-to-depth ratio
sutable for precast concrete
Is This Answer Correct ? | 13 Yes | 1 No |
Answer / h. k .prusty
By prestressed cocrete you can save the quantity of steel.
Is This Answer Correct ? | 6 Yes | 4 No |
Answer / prashanth
1.Time consuming will be less.
2.Required strength will be obtaining.
3.Wastage of the materials will be reduced.
4.Project work will not get delay.
5.required shape of the structure will be obtain.
6.Quality of the structure can be maintain.
Is This Answer Correct ? | 1 Yes | 3 No |
Answer / abdul hamid
Prestress Concrete advantages:
1)Reduced section of member (saved concrete quantity)
2)Induced negative bending moment before putting in to
loading condition, so concrete tention failure avoided.
3)less quantity of reinforcement.
4)Due to compressed concrete, higher load bearing capacity
of member.
Is This Answer Correct ? | 0 Yes | 2 No |
Water filter calculation formula
in BUILT UP AREA BASIS WHAT IS RATIO OF CONCRTE & STEEL RATIO MAY BE CONCIDER IN PER SQFT QTY
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
What are the different types of runners?
what is relation between SPT N value and driving piles after conducting a soil test?
How can calculate cement quantity in brick work
how to calculate slab reinforcement c/c spacing bars and how calculate minuam slab basic slab & roof beams reinforcement design
Who designed the city of washington dc?
What will be the crank length in an staircase is same like an slab?
Mix proportion of M30 grade?????????
1.how to calculate the nails qty in shuttering of column,beam, shear wall. 2.how control the binding wire wastage in building project. 3.
how many binding wire can be required for 1 metric tonne steel?